Laserfiche WebLink
<br />Fire Chief Keith Williams <br /> <br />~~ ~".J <br /> <br />ZEPHYRHILLS FIRE DEPARTMENT <br />6907 Dairy Road, Zephyrhills, FL 33542 <br />Bus (813)780-0041 Fax (813)780-0044 <br /> <br />FIRE SERVICE USER FEES <br /> <br />Occupancy No.: <br />Plan No.: "~ <br />Business Name: ;a. "'M~~ <br />Bus;ness Address: ~.. bl:> ~ = <br />Business Phone No.: <br />Business Fax No.: <br />Contact: <br /> <br />PLAN REVIEW FEES <br />B Site Plan N/C <br />MuUi-Family/Commercial .06 sf <br />(Minimum Charge $25.00 <br />o Plan Revisions DBL <br /> <br />SPRINKLER SYSTEMS <br />B 0 - 25 Heads $50 <br />26 plus Heads $100 <br />STANDPIPE SYSTEM <br />o Per Riser $50 <br />FIRE PUMP <br />o Per Pump <br />FIRE ALARM SYSTEM <br />B 0 - 25 Devices $50 <br />26 plus Devices $100 <br />SUPPRESSION SYSTEMS <br /> <br />8:2 :: <br /> <br />Bother $50 <br />KITCHEN EXHAUST <br />o HoodIDucts <br />OTHER <br />B LP Inslallation per tank <br />Fuel Tank Installation <br />(Per Tank) <br />o Natural Gas Installation <br />(Per System) <br />o Spray Booth <br /> <br />Comments: <br /> <br />INSPECTION FEES <br />N/C <br />N/C <br />$100 <br />$250 <br />$500 <br /> <br />$100 <br /> <br />Annual <br />1 st Re-inspection <br />2nd Re-inspection <br />3rd Re-inspection <br />4th Re-Inspeclion <br />(Business closed until <br />violations corrected) <br />SPRINKLER SYSTEMS <br />~ Hydro Undergrounds $45 <br />Hydrostatic Test $65 <br />Acceptance Test $45 <br />Hydrant Flow $75 <br /> <br />per system <br />per system <br /> <br />Contractor: -S ~"6 Its <br />Billing Address: <br /> <br />~0'S. ~ N f'<''\V\.~ <br /> <br />Billing Phone No.: <br />Billing Fax No.: <br />Contact: <br /> <br />PERMIT FEE <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$100 <br />$500 <br />$25 <br />$100 <br />$50 <br />$50 <br />$25 <br />$50 <br />$50 <br />$100 <br />150 <br /> <br />Sprinkler <br />Standpipes <br />Fire Pump <br />Hoods <br />Fire Alann <br /> <br />LP Gas <br />Natural Gas <br />FI}8I Tanks- pertank <br /> <br />Sparklers <br />Fire Works <br />Camp Fire <br />Controlled Bum <br />HoodIDuct <br />Place of Assembly <br />Fire Protection <br /> <br /> <br />Flammable Application <br />Waste Tire Storage <br />Generator < KW <br />Generator >30 KW <br />Bio-Hazard Waste <br />Fumigation Tenting <br />Torch Pot/Applied <br />Haz. Materials <br /> <br />B <br /> <br />$100 Annual <br /> <br />$50 <br />$50 <br />$100 Annual <br /> <br />PERMIT TOTALc=] <br /> <br />J <br /> <br />/s- <br /> <br />FALSE ALARM FEE <br />1 st Alann N/C <br />2nd Alann N/C <br />3rd Alann N/C <br />4th Alann $100 <br />5th A1ann $150 <br />6th Alann $200 <br />NONCOMPUANCE $150 <br /> <br />Annual <br /> <br />Annual <br /> <br />Annual <br /> <br />FALSE ALARM <br />TOTAL I <br /> <br />$50 ~ Tent 1 0'x1 0' or greater <br />Fire Pump <br />Fire Suppression <br />System Acceptance <br />B Exhaust HoodIDuct <br />Re-inspeclion <br />(other than annual) <br />$50 D Inspection scheduled DBL <br />and cancelled less than <br />24 hours <br />8 Construction Insp. N/C <br />rTlh Emergency Vehicle Ao $50 <br />PLANS TOTAL L1.1-f1JI INSPECTION TOTAL c:=rn- <br /> <br />FIRE ALARM SYSTEM <br />B System Acceptance $50 <br />Recall Acceptance $50 <br />OTHER <br />~ Fire WalllSmoke Wall <br />LP Gas <br />Natural Gas <br /> <br />$15 <br />$25 <br />$25 <br /> <br />per wall' <br />per tank <br />per system <br /> <br />$50 <br />$50 <br />$50 <br />$50 <br /> <br />$15 <br />$45 <br />$30 <br /> <br />per tent <br /> <br />$30 <br />DBL <br /> <br />GRAND TOTAL <br /> <br />Date: 7bi}~ <br />I nSij~ctor: )(t. ryy 3tltR,J en- -- F'M <br />