My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-8141
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-8141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:44:24 PM
Creation date
9/19/2008 12:44:59 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-8141
Building Department - Name
PALLANTE,EILEEN
Address
37349 DERBYSHIRE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~~~ <br /> <br />~9cifi-rLBy I7LC. <br />RESIDENTIAL · MOBILE HOME · COMMERCIAL <br /> <br />12630 Curley Street, Suite 104 · San Antonio, FL 33576 <br />Phone: 352-588-0910 - Fax: 352-588-0911 <br /> <br />LIC# CBC058155 - LIC# CCC1326166 <br /> <br />~)~7~/)'B1 f( <br /> <br />Re: Re-roof Proposal <br />Eileen Pallante <br />37349 Derbyshire Drive <br />Zephyrhills, FL <br /> <br />July 7, 2008 <br /> <br />6! '~r f)f Ali6tJJ r <br />{/' tJ~ r <br />~ <br /> <br />I1IILft - 5. VA I!-P <br /> <br />Neumann Roofing, Inc. proposes to furnish labor, material, supervision, equipment, fees and <br />other costs related to the completion of the subject property; specifications listed below: <br /> <br />1. Record NOC and obtain all required permitting. <br />2. Tear-off existing roof system down to deck substrate and re-nail roof deck to meet <br />State Of Florida Building Code. <br />3. Provide and install new 30# felt underlayment, nailed to meet local code requirements. <br />4. Provide and install new ALUMINUM drip edge around entire perimeter, matching the <br />existing face dimension. Color:;i~i~ <br />5. Provide and install new GAF/ELK starter strip at drip edge system. <br />6. Provide and install a new 30-year GAF/ELK Timberline Prestique high definition <br />shingle with stain guard. Color:;. <br />7. Strike lines to ensure a uniform shingle installation. <br />8. Provide and install20-feet of Owens Corning Sure Vent (ridge ventilation) on ridges. <br />Vent will be covered with ridge cap shingle to match roof system. <br />9. Provide and installl02-feet ofGAF/ELK SARridge cap. <br />10. Provide and install new 16" valley metal in all valleys. Prior to the installation of the <br />valley metal, we install an additional layer of underlayment protection. <br />11. Provide and install 3 new lead boots at plumbing vents. Boots will be painted to match <br />specified roof color. <br />12. Sweep magnets around the perimeter area of work to collect loose nails, staples, and <br />other various scrap sheet metal components. <br />13. Haul away all roof-related debris. <br />14. Our liability insurance coverage is based on completed operations. <br />15. Provide a 20-year GAFIELK weather stopper system plus limited warranty with <br />upgraded wind warranty up to 110 MPH (Free of charge). <br />16. Provide a 5-year workmanship warranty. <br />17. Payment schedule: Full amount at job completion. <br /> <br />_ FL. Contractor#: CCC1326l66 . GAF-ELKLicense#: ME12709 W <br />12630 Curley Street- Suite 104- San Antonio. Florida. 33576. Ph: (352) 588-0910 . Fax: (352) 588-0911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.