Laserfiche WebLink
<br />Haskell Co - Warehouse Expansion - Zhills Bottle - Type 4 <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 160,327 $ 68.00 <br />THER AREA UNDER ROOF: - $ - <br />OTHER: - $ - <br />VALUATION $ 8,992,496.00 <br />FEE SHEET $ 18,665.00 <br />ADDRESS $ - <br />DRIVEWAY $ - <br /> <br />BUILDING: i $ 19,038.30 <br />ELECTRICAL: $ 4,199.63 <br />PLUMBING: $ 2,799.75 <br />MECHANICAL: $ 1,959.83 <br />SUB-TOTAL $ 27,997.50 <br />RADON: $ 1,603.27 <br />TOTAL $ 29,600.77 <br /> <br />SEWER: $ 11,569.04 <br />WATER: $ 10.276.96 <br />IRRIGATION: $ - <br />TOTAL: is 21,846.00 <br /> <br />WATER METER: I $ <br />IRRIGATION METER $ <br /> <br />I Will have to advise Size <br />If applicable <br /> <br />FIRE DEPARTMENT FEES <br />PLANS TOTAL: $ 9,861.60 <br />INSPECTION TOTAL: $ 30.00 <br />PERMIT TOTAL $ - <br />TOTAL: $ 9,891.60 <br /> <br />PUBLIC SAFETY IMPACT FEES <br />POLICE $ 26,133.79 <br />FIRE $ 28,057.75 <br />5% $ 2,709.58 <br />TOTAL: $ 56,901.12 <br /> <br />SUB-TOTAL $ 118,239.491 <br /> <br />PARKIMPACTFEESI $ <br /> <br />I Not applicable <br /> <br />SIF'S: $ - <br />100.0% $ - <br />1.0% $ - <br />TOTAL: $ - <br /> <br />Not applicable <br /> <br />Total - T I F 'S: $ <br />99% $ <br />1% $ <br /> <br />130,508.62 <br />129,203.53 <br />1.305.09 <br /> <br />25% 32,627.15 75% 97,881.47 <br />99%- 32300.88 99%- 96,902.66 <br />1%- 326.27 1%- 978.81 <br /> <br />If Not Paid In Total <br />25% Due at Permit <br />Pickup wl75%due <br />Prior to Premeter <br />I PERMIT TOTAL: I $248,748.11 ~_ <br />Haskell Check <br />Overage @ P/up-Applied to OIS TIF <br />$97,881.47-New OIS TIF Balance <br /> <br /> <br />l)o{~,,<t) <br />99% 9119.38 1%- 92.12 AJtcft..,.1t'-- <br />99%- 87783.28 1%-886.69 -r' ~ <br /> <br />4,.-{ Co <br />