<br />D.
<br />
<br />E.
<br />
<br />JeW Wen Inc.
<br />
<br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
<br />
<br />A.
<br />
<br />DRAWINGS (Transferred from file # 02-1216.10)
<br />1. Manufacturer's die drawings and sections. i
<br />2. Drawing No. S-2108-01, titled "Wood Edge Opaque Steel Outswing", sheets 1 thro*gh
<br />8 of 8, prepared by PTC, LLC, dated 12-15-01 Last revised on 10/25/07, signed an4
<br />sealed by Eric S. Nielsen, P.E. i
<br />I
<br />I
<br />TESTS (Transferred from file # 02-1216.10) Original test conducted per SFBC, P A 202-94,1
<br />now known as FBC, T AS 202-94 I
<br />1. Test reports on 1) Air Infiltration Test, per FBC, TAS 202-94 I
<br />2) Unifonn Static Air Pressure Test, Loading per FBC, T AS 202-94 I
<br />3) Water Resistance Test, per FBC, TAS 202-94 I
<br />4) Large Missile Impact Test, FBC TAS 201-94 I
<br />5) Cyclic Loading Test, per FBC T AS 203-94 i
<br />6) Forced Entry Test, perFBC 24113.2.1 and TAS 202-94 I
<br />along with marked-up drawings and installation diagram of outswing Glazed steel d~or,
<br />prepared by Certified Testing Laboratories, Inc., Test Report No. CTLA 697W A, dtted
<br />11/12/01, signed and sealed by Rame.sh Patel, P.E. t
<br />2. Additional test report I
<br />I
<br />Test reports on 1) Air Infiltration Test, per FBC, TAS 202-94 i
<br />2} Unifonn Static Air Pressure Test, Loading per FBC T AS 202-94 I
<br />3) Water Resistance Test, per FBC, TAS 202-94 I
<br />4) Forced Entry Test, per FBC 3603.2 (b) and TAS 202-94 r'
<br />along with marked-up drawings and installation diagram of wood edge outswing gl
<br />steel door, prepared by Certified Testing Laboratories, Test Report No. CTLA- 961 ,
<br />dated 10/23/01, signed and sealed by Ramesh C. Patel, P .E. I
<br />I
<br />CALCULATIONS 11
<br />1. Anchor Verification Calculations, prepared'by PTC, LLC, dated 06/20/07, signed d
<br />sealed by Eric S. Nielsen, P.E. .
<br />2. Glazing complies w/ ASTME-1300-02 .
<br />I
<br />
<br />B.
<br />
<br />C.
<br />
<br />QUALITY ASSURANCE
<br />1. Miami Dade Building Code Compliance Office (BCCO).
<br />
<br />MATERIAL CERTIFICATIONS .
<br />1. Notice of Acceptance No. 05-0921.09 issued to ODL, Inc. for "HP Propropylene
<br />Doorlight Assembly", expiring on 1/17/11.
<br />2. Notice of Acceptance No. 07-0828.01, issued to Trinity Glass International, Inc. for
<br />''Trinity Lite Frame" expiring on 7/3/12. I
<br />3. Tensile Test prepared by Internek Testing Services Inc., Project No. J99OO6660-001
<br />dated 3/30/99, tested per ASTM E84-97a and ASTM D 1929-91.
<br />
<br />E-l
<br />
<br />
|