My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-8260
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-8260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2008 10:51:21 AM
Creation date
10/22/2008 10:28:11 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-8260
Building Department - Name
EAST PASCO YMCA
Address
37301 CHAPEL HILL LP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Fire Chief Keith Williams <br /> <br />ZEPHYRHILLS FIRE DEPARTMENT <br />6907 Dairy Road, Zephyrhills, FL 33542 <br />Bus (813)780-0041 Fax (813)780-0044 <br /> <br />FIRE SERVICE USER FEES <br /> <br />Occupancy No.: <br />Plan No.: l!>f).... o~. <br />Business Name: 1\'IL.;q <br />Business Address: at?Ol (~~}~~\ ~ <br />Business Phone No.: <br />Business Fax No.: <br />Contact: <br /> <br />PLAN REVIEW FEES <br />Site Plan <br />Mufti-Family/Commercial <br /> <br /> <br />D Plan Revisions <br /> <br />SPRINKLER SYSTEMS <br />B 0 - 25 Heads $50 <br />26 plus Heads $100 <br />STANDPIPE SYSTEM <br />D Per Riser $50 <br />FIRE PUMP <br />D Per Pump <br />FIRE ALARM SYSTEM <br />B 0 - 25 Devices $50 <br />26 plus Devices $100 <br />SUPPRESSION SYSTEMS <br /> <br />B.~~ :: <br /> <br />Bother $50 <br />KITCHEN EXHAUST <br />D Hood/Ducts <br />OTHER <br />B LP Installation per tank <br />Fuel Tank Installation <br />(Per Tank) <br />D Natural Gas Installation <br />(Per System) <br />o Spray Booth <br /> <br />Comments: <br /> <br />N/C <br />.06 sf <br /> <br />INSPECTION FEES <br />N/C <br />N/C <br />$100 <br />$250 <br />$500 <br /> <br /> <br />Contractor: <br />Billing Address: <br /> <br />Billing Phone No.: <br />Billing Fax No.: <br />Contact: <br /> <br />PERMIT FEE <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$50 <br />$100 <br />$500 <br />$25 <br />$100 <br />$50 <br />$50 <br />$25 <br />$50 <br />$50 <br />$100 <br />150 <br /> <br />Sprinkler <br />Standpipes <br />Fire Pump <br />Hoods <br />Fire Alarm <br />LP Gas <br />Natural Gas <br />F!;JE!' Tanks- pertank <br /> <br />Sparklers <br />Fire Works <br />Camp Fire <br />Controlled Bum <br />HoodIDuct <br />Place of Assembly <br />Fire Protection <br /> <br />Flammable Application <br />Waste Tire Storage <br />Generator < KW <br />Generator >30 KW <br />Bio-Hazard Waste <br />Fumigation Tenting <br />Torch Pot/Applied <br />Haz. Materials <br /> <br />B <br /> <br />PERMIT TOTALc=J <br /> <br />~S""- <br /> <br />FALSE ALARM FEE <br /> <br /> <br />1 st Alarm <br />2nd Alarm <br />3rd Alarm <br />4th Alarm <br />5th Alarm <br />6th Alarm <br />NON COMPUANCE <br /> <br />N/C <br />N/C <br />N/C <br />$100 <br />$150 <br />$200 <br />$150 <br /> <br />$50 ~ Tent 1 QX1 0' or g.1'!i8ter <br />Fire Pump <br />Fire Suppression <br />System Acceptance <br />B Exhaust HoodIDuct <br />Re-inspection <br />(other than annual) <br />$50 .0 Inspection scheduled DBL <br />and cancelled less than <br />24 hours <br />B Construction Insp. N/C <br />Emergency Vehicle Ao $50 <br />PLANS TOTAL~ INSPECTION TOTAL[:=J <br /> <br />DBL <br /> <br />Annual <br />1st Re-inspection <br />2nd Re-inspection <br />3rd Re-inspection <br />4th Re-Inspection <br />(Business closed until <br />violations corrected) <br />SPRINKLER SYSTEMS <br />~ Hydro Undergrounds $45 <br />Hydrostatic Test $65 <br />Acceptance Test $45 <br />Hydrant Flow $75, <br /> <br />per sysIBm <br /> <br />Annual <br /> <br />Annual <br />Annual <br /> <br />$100 Annual <br /> <br />$50 <br />$50 <br />$100 Annual <br /> <br />FALSE ALARM <br />TOTAL I <br /> <br />per system <br /> <br />$100 <br /> <br />FIRE ALARM SYSTEM <br />B System Acceptance $50 <br />Recall Acceptance $50 <br />OTHER <br />~ Fire WalllSmoke Wall <br />LP Gas <br />Natural Gas <br /> <br />$15 <br />$25 <br />$25 <br /> <br />per wall <br />per tank <br />per system <br /> <br />$50 <br />$50 <br />$50 <br />$50 <br /> <br />$15 <br />$45 <br />$30 <br /> <br />per tBnt <br /> <br />$3Q <br />OBL <br /> <br />GRAND TOTAL <br /> <br />Dme:~ <br />Insij~ctor: . <br /> <br />I1wJ- -fiA-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.