Laserfiche WebLink
§ 9.3.3 The Contractor may make a substitution only with the consent of the Owner, after evaluation by the Architect <br /> and in accordance.with a Modification. <br /> § 9.4 WARRANTY <br /> The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will <br /> be of good quality and new unless the Contract Documents require or permit otherwise. The Contractor further <br /> warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects, <br /> except for those inherent in the quality of the Work the Contract Documents require or permit. Work, materials, or <br /> equipment not conforming to these requirements may be considered defective. The Contractor's warranty excludes <br /> remedy for damage or defect caused by abuse, alterations to the Work not executed by the Contractor, improper or <br /> insufficient maintenance, improper operation or normal wear and tear under normal usage. <br /> § 9.5 TAXES <br /> The Contractor shall pay sales, consumer, use and other similar taxes that are legally enacted when bids are received <br /> or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. <br /> § 9.6 PERMITS, FEES, NOTICES, AND COMPLIANCE WITH LAWS <br /> § 9.6.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building <br /> permit as well as other permits, fees, licenses and inspections by government agencies necessary for proper <br /> execution and completion of the Work that are customarily secured after execution of the Contract and legally <br /> required at the time bids are received or negotiations concluded. <br /> § 9.6.2 The Contractor shall comply with and give notices required by applicable laws, statutes, ordinances, codes, <br /> rules and regulations, and lawful orders of public authorities applicable to performance of the Work. If the <br /> Contractor performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and <br /> regulations, or lawful orders of public authorities, the Contractor shall assume appropriate responsibility for such <br /> Work and shall bear the costs attributable to correction. <br /> § 9.7 ALLOWANCES <br /> The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. The Owner shall <br /> select materials and equipment under allowances with reasonable promptness. Allowance amounts shall include the <br /> costs to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade <br /> discounts. Allowance amounts shall not include the Contractor's costs for unloading and handling at the site, labor, <br /> installation, overhead, and profit. <br /> § 9.8 CONTRACTOR'S CONSTRUCTION SCHEDULES <br /> § 9.8.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner's and <br /> Architect's information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits <br /> current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the <br /> Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and shall <br /> provide for expeditious and practicable execution of the Work. <br /> § 9.8.2 The Contractor shall perform the Work in general accordance with the most recent schedule submitted to the <br /> Owner and Architect. <br /> § 9.9 SUBMITTALS <br /> § 9.9.1 The Contractor shall review for compliance with the Contract Documents and submit to the Architect Shop <br /> Drawings, Product Data, Samples and similar submittals required by the Contract Documents in coordination with <br /> the Contractor's construction schedule and in such sequence as to allow the Architect reasonable time for review. By <br /> submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents to the Owner <br /> and Architect that the Contractor has (1) reviewed and approved them; (2) determined and verified materials, field <br /> measurements and field construction criteria related thereto, or will do so; and (3) checked and coordinated the <br /> information contained within such submittals with the requirements of the Work and of the Contract Documents. <br /> The Work shall be in accordance with approved submittals. <br /> § 9.9.2 Shop Drawings, Product Data, Samples and similar submittals are not Contract Documents. <br /> AIA Document A107'' — 2007. Copyright © 1936, 1951, 1958, 1961, 1963, 1966, 1970, 1974, 1978, 1987, 1997 and 2007 by The American Institute of <br /> Init. Architects. All rights reserved. WARNING: Thls AIA Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized 8 <br /> reproduction or distribution of this AIA` Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the <br /> maximum extent possible under the law. This document was produced by AIA software at 13:11:21 on 09/15/2009 under Order No.8649255540_1 which <br /> expires on 09/30/2010, and is not for resale. <br /> User Notes: (1093954413) <br />