Laserfiche WebLink
Two Collector Skyline 20 -01 Top View (10 -01 collectors use 2 rails about 1' in from the ends) <br /> 2 7 <br /> 8 3 <br /> 1 1: <br /> 1 4 <br /> ( <br /> 1 <br /> 2A <br /> 5 <br /> The Diagram above is a top view of two collectors installed together showing: <br /> 1. Two 20" x 12' Collectors mounted with connections to the right. <br /> 2. The Mounting Rails with Mounting Brackets (3 rails and 6 Mounting Brackets plus 3 Quick Connect Clips (QCC) <br /> per additional collector set (6.), 3 two panel rails, 6 Mounting Brackets and 3 QCCs shown in this diagram). <br /> 2A. Mounting Rail Lag holes top and bottom. <br /> 3. The "Hot Out" Collector connection going to the storage tank. <br /> 4. The between Collector connection. <br /> 5. The "Cold In" Collector connection from the storage tank. <br /> 6. The Quick Connect Clip bolts to the mounting rail here with the tabs overlapping the top of the collector. <br /> 7. Collector Glazing (Lexan) <br /> 8. Collector trim sections. <br /> 2001 Side View <br /> 8 <br /> 3 <br /> V 2A 2B 2C 2 <br /> The above Diagram shows a side view of the Collector installed o9. the roof and shows: <br /> (Refer to Color Pictures for Details of Ell Brackets) <br /> 1. Side view of a Collector. 2C. Roof Rafter. <br /> 2. Mounting Rails (3 per 20 -01 collector). 3. Collector feed or return connection. <br /> 2A. Mounting Rail Lag. 8. Collector Trim. <br /> 2B. Roof sheathing. <br /> LAGS AND RAFTERS: <br /> For maximum strength, you want your mounting rail (2) lags (2A) to go into rafters. After locating the best <br /> area for the collector, "sound out" the roof for the rafters with a hammer and mark the rafter centers with chalk. <br />