2. tie new roof into existing roof with valley system <br /> 3. roof sheathing to be 1 /2" OSB plywood <br /> 4. wood fascia to match existing fascia <br /> 5. gable end to be T -1 -11 siding <br /> 6. roof system built to conform to wind code requirements <br /> 7. roof dried in with 301b felt <br /> Roofing <br /> 1. all shingles to be 30 yr. dimensional <br /> 2. valley tied in to existing roof and flashed to prevent leaks <br /> Interior Finishes - none <br /> Exterior Finishes <br /> 1. all overhangs receive aluminum facia and soffit <br /> 2. one 3' x 6' 8" panel steel door <br /> 3. one #24 single hung aluminum window and one #34 single hung aluminum <br /> window, white or bronze frame <br /> 4. exterior keyed lock on new door <br /> 5. shell cleaned at final inspection <br /> Contract Change Orders <br /> • Owners may at any reasonable time during the progress of the work, by an order <br /> in writing, agreed to and signed by both parties, make any alteration to the plans <br /> and specifications, and the work shall then be executed according to conformance <br /> with an executed Contract Change Order. Any change from the signed plans and <br /> specifications must be in writing and must be paid for at the time the change is <br /> agreed upon. If the change is a deletion the amount shall be credited against the <br /> final payment. There will be a $250.00 administration fee for each change order. <br /> Commencement Date and Protection <br /> • The contract amount has been determined as of the Contract date. Because of <br /> periods of inflation in the building industry, Builder will only guarantee that <br /> amount for 45 days from Contract date. If any problems arises which delays <br /> commencement through no fault of Builder, there may be an additional amount <br /> added to contract. This figure will be determined at the time that construction <br /> commences. At that time, if Builder requests a price increase in writing, Owner <br /> has the firm option of canceling the Contract by a letter in writing to Builder <br /> within ten (10) calendar days from the date increase is requested. <br /> -2- <br />