My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9736
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2011 10:47:45 AM
Creation date
1/10/2011 10:43:20 AM
Metadata
Fields
Template:
Building Department
Company Name
NHCFL 115 LLC
Building Department - Doc Type
Permit
Permit #
09-9736
Building Department - Name
MAJESTIC OAKS
Address
3819 ROYAL TROON WAY LT 26
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
031 27/2007 15:43 6785745700 BRIAN VALEN T E PAGE 01 <br /> f "�I L`i_ T. • fl.Q •.•V. . W N IN$TPEU011oas FOR Tee '!. <br /> " No. 155 «'; <br /> i * : *t <br /> Mt3DE f ref " nr ( aTa ra f - 18I j <br /> * y MODEL L ff0I -L" W <br /> V 1,O;trUol14AL ONLY: . <br /> •..t • ? a: AOLLOtMSTEPS 1d <br /> '• 'M <br /> c ID OF f Mit ADDING LA TERAt ARM: <br /> • �► MAW <rr , Ballow 710.15 <br /> ENIINWERS STAPP <br /> .;..vP.t • ... .0: <br /> 1. 5 • • .,a2- i . ' I ES: If the following conditions occur - STOPr Contact OM er Technalo. 1400484-7437 . <br /> a) Pier h - - • 4r b) Length of home exceeds 78' c) Roof eaves exceed 16" cI) Slde+etell height exceed 96" <br /> e) Loca t$ n is within 1500 feet of coast <br /> INSTALLATION OF GinegumiN <br /> 2. Remove Weeds end debris in an approximate two foot square to expose arm soil tor each ground pan (C) . <br /> 3. Place grokind pan (C) directly below chorale I -beers . Press or rive pan firmly into soil t ntN flush with or below soil. <br /> SPECIAL !NOTE: The longitudinal "V' brad system ewes ea a pier under the home and should be loaded as any <br /> ether pier.! it is recommended that after leveling piers, end one -half inch (1/21 beAxe home is Towered completely on <br /> to piers, c,mplete steps 4 through 9 below. <br /> NOTE: WHEN litsTALUNG THL MODEL 0 f laf-i" o• LONatIV >INAL STBTHB MX A MINIMUM OF 2 SYSTEME PER FLOOR SECTimN Is <br /> REQUIRED. SOIL TUT PROBE SNOULD SE IMO TO DETERMINE CORRECT DUPE OF MICNOR PER SON. CLASSIFICATION. IF PROBE TEST <br /> READINGS ARE BEEN 175 a 276 A 6 FOOT ANCHOR MUST SE USED. IF PRONE TEST READINGS ARE BAN 27e a 36) A 4 PORT ANCHOR <br /> MAT 8E USED. USE GROUND ANCHORS IIIIITH DIACONAL TIES AND sTADILMER PLATES EVERY S'4' . VERTICAL TIES ARE ALSO REQUIRED ON <br /> HOMES SUPPLIED *4 VERTICAL TIE CONNECTION POSITS i.e R FLORIDA REG.) . <br /> 4. Select the correct ware tube brace (E) length For set - up (pr) height at support iocadon. (The 10" tube Is always <br /> used as the bottom part of the longitudinal arm). Note: Either tube can be used by Iteslf, cut and drilled to length as long as a <br /> 40 to 46 degree angle E maintained. <br /> PIER HEIGHT 1.25" ADJUSTABLE 1.50' ADJUSTABLE <br /> (Approx. 45 degrees Max) Tube Length Tube Length <br /> 7 3/4" to 25" 22" 18" <br /> 24 3/4" to 32 1/4" 32" 18" <br /> 33" to 41" 44" 18" i <br /> 5. Install (2) of the 1.50" square tubes (E {16" tube} ) into the "U" bracket (J), insert carriage boil and leave nut loose for fins: <br /> ed)ustmetrt. <br /> 6_ Place 1 -beam connector (F) loosely on the boUorn flange of the I - balms. <br /> 7. Slide the selected 1.25" tube (E) into a 1 tube (E) and attach ea I-beam Bonnet (F) end fasten loosely with bolt and nut. <br /> 8. Repeat steps 6 thnxtgh 7 to create the "Y pattern of the square tunes loosely In place. The angle is not to exceed 45 <br /> degree end not below 40 degrees. <br /> 9. After all boas are tightened, secure 125" and 1.SQ" tubes using four(4) 1/4'-14 x3/4" see$ lappin(I screws In pm-drilled Pales. <br /> I NNALLMtatnelasmijurgazzattrOBAMSYfiaraufatErgnid <br /> THE MODEL i le1 'V" (LONGITUDINAL & LATERAL PROTECTEXT) SWMKATES TNR NSW FOR MOST STABILIZER PLATES & FRAME 71E8. <br /> Raft ThIk usE OF TIM 8YSTam REQUIRES %/ M E AL TIES SPACER AT P4 ". <br /> rotor PoOT (4') Gotoublo ANcNOR MAY aE uSelo EXCEPT WNRRR THE HQOE MANUFA 7%JRE j EPRCF'IES DIFFERENT. <br /> 10. Install remaining vertical tie -down entraps and 4' ground anchors per home manufeteurers instructions. NOTi: Centerline <br /> anchors to be sized ecoording to soil torque lion. Any manufacturer's speciffcations for sidewaf anchor loads in excess of <br /> 4900 lbs. require a 5' anchor. <br /> 11. NOT Each system Is teethed to have a from tie and stabilizer et heel at each laterei earl stabili <br /> stabilizer plate needs to be located within 18" from of Center ground zing bcxrtran. This frame tits from <br /> 12. Selec t e tomtit acme tube brace (H) fart" For set-UP lateral transverse et support location. The lengths corns In either 6;3" <br /> lengths, (With the 1.50" tube 89 the bottom tube, end the 1.25" tube es the Inserted tube.) <br /> 13. Install the 1.50 P nsverse brace (H) to the ground pan connector (D) with bolt and nut. • <br /> 14. Slide 1.25" transverse brace into Cite 1.50' brace and attach to adjacent I-beem connector (I) with butt arli nut. <br /> • NIANUPACIUMIE mum. <br /> A OF O1,l T T n 83 -796 d55A <br /> 1- 2t1� -7437 It�IC : MI- 79134ait <br /> mrtachnoklpiee.corn <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.