Laserfiche WebLink
- 03/27/200T " 1 U 5: f 43 6785745700 BRIAN VALENTE PAGE 01 <br /> o° • ¢ c':;,: + t�N TI;CHNOL46iHa, INC. r, <br /> A.OFSDA N5TALt.ATIQN INsTRUCrioHe FOR THE ' ,, <br /> : No 15396 '; ,. I M5S T ire • v ^ A. s =,X. ,, . <br /> * ■ , MODEL 11fFe ^V mire 1.181 ' , j <br /> PI . * , El. 1101- L'V"I.Omarrt D seer. a1W r: <br /> ; "0 . : a. r FOLLOW STEPS 1. <br /> . 'STATE OF 4r./. FOR.4DDNVO M <br /> +0 arose :it 1045 c ot STAMP <br /> 1. $ ES: if the following conditions occur - STOP! Contact Ofllmr Ter"hnob • .. = 9-80 284 -7437 <br /> a) Pier h 48" b) Length of home exceeds 78' c) Roof eaves exceed 18" d) !Wrest! hetgtet exceed 96" <br /> e) Locatfon is within 1500 feat of coast <br /> J 4STALd.AT1ON OLGBE D PAN <br /> 2. Remove weeds end debris in an appro,d a to two Dot square to expose firm soil tor each ground pan (C) . <br /> 3. Piece gmlind pan (C) directly below chassis I -beam . Press or drive pan firmly into soil until flush with or below soil. <br /> SPECIAL !NOTE: The longitudinal "1r brew system serves as a pier under the home and should be loaded as any <br /> other pierj it is recommended thel after liming press, and ore -half inch (1/2") bebre home is lowered completely on <br /> to piers, c mpleIe steps 4 through 9 below. <br /> RISTALLIMNSILIANNERNAI <br /> NOTE: WHEN INSTALLING THE MODEL 0 1101»L"0'tosterTLIN fAL STETEINPRILX. A MIMES OF 2 8YRTEsAS PER FLObat section t5 <br /> REQUIRED. SOIL TEST PROBE SHOVLU SE U000 TO DETERMINE CORRECT TAPE OF ANCHOR PER BOIL cLAssincATION. IF PROBE TEST <br /> READINGS ARE EM MEN 175 It 275 A 0 FOOT ANCHOR MUST BE MED. iF PROBE TEST READINGS ARE BETWEEN 275 A B55 A 4 FOOT ANCHOR <br /> MAT SE USED. USE GROUND ANCHORS WITH DIAN: NAL TIES Ally STABILIZER PLATES EVERY 5'4" . VERTICAL TIES ARE ALSO REQUIRED ON <br /> HOMES *IJPPLiED EFFrH VERTICAL 110 CONNECTION PoNns (MR FLORIDA Ma.) . <br /> 4. select the correct ware tube brace (E) length for set - up (pier) height at support motion. (Tice 'S" tube is always <br /> used es the bottom part of the longitudinal arm). Note: Either tube can be used by IWsif, cut and drilled to length as long ais a <br /> 40 to 46 degttas angle is malntalned. <br /> PIER HEIGHT 1,25" ADJUSTABLE 1.50" ADJUSTABLE <br /> (Approx. 45 degrees Max) Tube Length Tube Length <br /> 7 3/4" to 25" 22" 18 " -•-• <br /> 24 3/4° to 32 1/4" 32" 18° <br /> 33" to 41" 44" 18" <br /> =r'to -IT <br /> 1` <br /> 5. install (2) of the 1.50" square tubes (E {16" tube} ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final <br /> edJustrnert, <br /> 8. MOM 1-beam connector (F) loosely on the bottom flange of the I - beam. <br /> 7. Slide the selected 1.25" tube (E) Into a 1.50" tube (E) and attach to I-beam connectors (F) and fasten loosely with bolt and nut. <br /> 8. Repeat steps 8 through 7 to create the "V" pattern of the square tubes loosely In place. The angle is not to exceed 45 <br /> degree end not below 40 degrees. <br /> 9. After ant bolts are tightened, secure 1.25" and 1.5Q" tubes using four(4) 114 " - 144 x 3'4" seN=tappfng a 'awe in pre.dr*led holes. <br /> tfYi7ALLd77Ohi OP 1 e, Trs1 ter•rL <br /> THE atom 1151 °ir" (LONGITUt1aAL & LATERAL TION) EUIMNATES TM NSW Fon Amer STABILIZER PLATES & FRAME TIES. <br /> imoon Fool (4') acou e(MOte MAY 15 u exams wHeen THE How AC�I R 3P <br /> MANUFACTURER BPI:ti1PIES DIFFERENT. <br /> 10, install remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline <br /> anchors to be sized aaoo►dmg to soil torque condition. Any rnantNacturers speofficatbrts for *Jewell anchor loads in excess of <br /> 4,000 lbs. require a 5' anchor. <br /> 11. NOTE: Each system le required to have a frame tie and stabilizer ached at each lateral terrrl stabilizing stabilizer plate nn„ed 18" hrn <br /> e to be located within o of tenter ground pen. <br /> This frame tie & <br /> 12. Select the Cornett square tube brace (H) length for sip lateral transverse at <br /> support <br /> or 72" lengths, (With tie 1.50" tube 83 Vre bottom. tube, end the 125 tube es .the ed tube . ) Thel lengths carne in either 80" <br /> 13. Install the 1.50 transverse brace (H) to the ground pan star (D) with belt and nut. • <br /> 14. Slide 1.25" transverse brace into the 1.50" brew and attach to adjacent i-beam actor (1) with bolt and nut. <br /> • • - users .-r + 7:i:. : : T • O r <br /> A OF o POUNDATWN SYSTEMS <br /> Telephpn9: 831 - 79IS ssr <br /> TECHNOLOGIES , Fox: 951 - 793551 t <br /> 1-800 www.orfvettachnobpiecom <br />