My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9748
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2011 10:58:00 AM
Creation date
1/10/2011 10:57:59 AM
Metadata
Fields
Template:
Building Department
Company Name
FIRST CHRISTIAN CHURCH
Building Department - Doc Type
Permit
Permit #
09-9748
Building Department - Name
FIRST CHRISTIAN CHRUCH
Address
6040 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire :Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Marshal Bus (813) 780 -0041. <br /> Kerry Barnett Fax (813) 780 -0044 <br /> E -mail: k:barnett@fire.zephyrhills.fl.us <br /> Plan Review #: 09 -091 <br /> Project: Hood/Duct <br /> Number of Pages: 1 <br /> November 1, 2009 <br /> I have received and reviewed the plan for the hood & duct installation located at 6040 8th <br /> Street. The plans were incomplete due to not showing any of the duct work and the <br /> installation assembly going through the roof. However, after speaking with the main <br /> contractor involved, Ryman Construction, this office will let the hood install proceed. <br /> Please note that this review does not eliminate any further requirements as the project <br /> continues moving forward. By paying for permit, contractor acknowledges to comply <br /> with the items listed below. Should anyone have any questions, please do not hesitate to <br /> contact the Fire Marshal's office. <br /> 1. Shall be installed in accordance to NFPA 96, latest edition. <br /> 2. Plans shall be submitted to this office on the duct information and installation <br /> (dimensions, make, clearances required, etc...) Plans must also show the <br /> make up air and distances from the exhaust. <br /> 3. Roof top fan shall be hinged with a grease containment cup. <br /> 4. A non combustible backsplash shall be installed behind the cooking <br /> equipment from floor to bottom of hood. Example would be Stainless steel or <br /> tile. <br /> Inspections Required: <br /> 1. Li • • - st shall be conducted on all welding seams to ensure the assembly is <br /> • • uid t' :ht. ractor shall supply the equipment to conduct the test. <br /> 2. Aw --.11� and balance of the system is required at time of overall final. <br /> KERR. • 6 47 . , FIRE MARSHAL <br /> ** *Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals areas of non - compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.