Laserfiche WebLink
813-780 -0020 City of Zephyrhills Permit Application Z y Fax-813-780-0021 <br /> Building Department <br /> k 7753 <br /> Date Received Phone Contact for Permitting -- <br /> Owner's Name )2-- v‘ r', e + L /A- 3Th ne Owner Phone Number 81 3 Oj c( ') ^ o i� <br /> Owner's Address T /30 lc 1 3 'Zee}. 4-11 11 S X1,3'3 Owner Phone Number j) ` j - 7 S' FS 7 /S S Fee Simple Titleholder Name Owner Phone Number <br /> Fee Simple Titleholder Address <br /> JOB ADDRESS SC( L) 3 1 31'S+ LOT # <br /> SUBDIVISION PARCEL ID# h , ) " OCR I.0 -0)-100 00 •-0O) O <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> WORK PROPOSED NEW CONSTR ADD /ALT I 1 SIGN 1 1 MOVE I I DEMOLISH <br /> INSTALL REPAIR <br /> PROPOSED USE 1 I SFR 1 1 COMM 1 1 OTHER 1 I <br /> TYPE OF CONSTRUCTION [] BLOCK I I FRAME 1 1 STEEL OTHER 1 1 <br /> DESCRIPTION OF WORK CCvvVL )+1 -V') Y. k-e -- i re- <br /> BUILDING SIZE SQ FOOTAGE / i 0 HEIGHT 5) rt6 k <br /> BUILDING $ <br /> VALUATION OF TOTAL CONSTRUCTION % Z 3 — <br /> I I ELECTRICAL $ AMP SERVICE 1 1 PROGRESS ENERGY ri W.R.E.C. <br /> PLUMBING $ <br /> I 1 MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION <br /> 1 GAS I 1 ROOFING 1 1 SPECIALTY I 1 OTHER <br /> FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA 1 IYES 1lNo <br /> BUILDER 1C� - G/� COMPANY a"►^ e,/" <br /> SIGNATURE REGISTERED I Y/ N I FEE CURRENT 1 Y/ N 1 <br /> Address License # <br /> ELECTRICIAN COMPANY <br /> SIGNATURE REGISTERED 1 Y/ N j FEE CURRENT I Y / N I <br /> Address 1 License # <br /> PLUMBER COMPANY <br /> SIGNATURE REGISTERED 1 Y/ N 1 FEE CURRENT I Y/ N 1 <br /> Address ' License # <br /> MECHANICAL COMPANY <br /> SIGNATURE REGISTERED 1 Y/ N 1 FEE CURRENT 1 Y/ N 1 <br /> Address License # <br /> OTHER COMPANY <br /> SIGNATURE REGISTERED 1 Y/ N 1 FEE CURRENT 1 Y/ N 1 <br /> Address License # <br /> RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R -O -W Permit for new construction, <br /> Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, <br /> Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions /large projects <br /> COMMERCIAL Attach (3) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R -O -W Permit for new construction. <br /> Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, <br /> Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance <br /> SIGN PERMIT Attach (2) sets of Engineered Plans. <br /> * ** *PROPERTY SURVEY required for all NEW construction. <br /> Directions: <br /> Fill out application completely. <br /> Owner & Contractor sign back of application, notarized <br /> If over $2500, a Notice of Commencement is required. (A/C upgrades over $5000) <br /> ** Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMITTING (Front of Application Only) <br /> Reroofs Sewers Service Upgrades A/C Fences (Plot/Survey /Footage) <br /> Driveways -Not over Counter if on public roadways..needs ROW <br />