Laserfiche WebLink
Compliance Summary <br /> Component Design Criteria Result <br /> Gross Energy Cost (in $) 11,545.0 14,430.0 PASSED <br /> LIGHTING CONTROLS PASSES <br /> EXTERNAL LIGHTING None Entered <br /> HVAC SYSTEM PASSES <br /> PLANT None Entered <br /> WATER HEATING SYSTEMS None Entered <br /> PIPING SYSTEMS None Entered <br /> Met all required compliance from Check List? Yes/No/NA <br /> IMPORTANT MESSAGE <br /> Info 5009 -- -- -- An input report of this design building must be submitted along with this <br /> Compliance Report <br /> l'a\t‘ <br /> EnergyGauge Summit® Fla /Com -2008. Effective: March 1, 2009 <br /> 1 1/12/2009 Page 2 of 8 <br />