Laserfiche WebLink
Project: 206319.0.10 <br /> Title: Tenant Space Fl -F4 @ Zephyr Commons <br /> Type: Retail <br /> (WEA File: FL_TAMPA_INTERNATIONAL_AP.tm3) <br /> Other Required Compliance <br /> Category Section Requirement (write N/A in box if not applicable) Check <br /> Report 13 -101 Input Report Print -Out from EnergyGauge FlaCom attached <br /> Operations Manual 13- 102.1, Operations manual provided to owner <br /> 13 -410, 13 -413 <br /> Windows & Doors 13- 406.AB.1.1 Glazed swinging entrance & revolving doors: max. 1.0 cfm/ft all <br /> other products: 0.4 cfm/ft <br /> Joints /Cracks 13- 406.AB.1.2 To be caulked, gasketed, weather- stripped or otherwise sealed <br /> Dropped Ceiling Cavity 13- 406.AB.3 Vented: seal & insulated ceiling. Unvented seal & insulate roof & <br /> side walls <br /> System 13-407 HVAC Load sizing has been performed <br /> Reheat 13 -407.B Electric resistance reheat prohibited <br /> HVAC Efficiency 13 -407, 13 -408 Minimum efficiences: Cooling Tables 13- 407.AB.3.2.1A -D; <br /> Heating Tables I3- 407.AB.3.2.1B, 13- 407.AB.3.2.1D, <br /> 13- 408.AB.3.2.1E, 13- 408.AB.3.2F <br /> HVAC Controls 13- 407.AB.2 Zone controls prevent reheat (exceptions); simultaneous heating EIV <br /> and cooling in each zone; combined HAC deadband of at least 5 °F <br /> ( exceptions) <br /> Ventilation Controls 13- 409.AB.3 Motorized dampers reqd, except gravity dampers OK in: 1) exhaust <br /> systems and 2) systems with design outside air intake or exhaust <br /> capacity <300 cfm <br /> ADS 13 -410 Duct sizing and Design have been performed I ( J tX <br /> HVAC Ducts 13- 410.AB Air ducts, fittings, mechanical equipment & plenum chambers shall <br /> be mechanically attached, sealed, insulated & installed per Sec. <br /> 13 -410 Air Distribution Systems <br /> Balancing 13- 410.AB.4 HVAC distribution system(s) tested & balanced. Report in EY- <br /> construction documents <br /> Piping Insulation 13 -41 l .AB In accordance with Table 13 -41 1.AB.2 EY- <br /> Water Heaters 13- 412.AB Performance requirements in accordance with Table 13- 412.AB.3. IR <br /> Heat trap required <br /> Swimming Pools 13- 412.AB2.6 Cover on heated swimming pools: Time switch (exceptions); <br /> Readily accessible on /off switch <br /> Hot Water Pipe 13 -41 LAB.3 Table 13 -41 1.AB.2 for circulating systems, first 8 feet of outlet E <br /> Insulation pipe from storage tank and between inlet pipe and heat trap <br /> Water Fixtures 13- 412.AB.2.5 Shower hot water flow restricted to 2.5 gpm at 80 psi. Public h"!1 <br /> lavatory fixture how water flow 0.5 gpm max; if self - closing valve <br /> 0.25 gallon recirculating, 0.5 gallon non recirculating <br /> IlE( ' <br /> Motors 13 -414 Motor efficiency criteria have been met <br /> Lighting Controls 13- 415.AB Automatic control required for interior lighting in buildings >5,000 <br /> s.f.; Space control; Exterior photo sensor; Tandom wiring with 1 or <br /> 3 linear fluuorescent lamps >30W <br /> EnergyGauge Summit® Fla /Com -2008. Effective: March 1, 2009 <br /> 11/12/2009 Page 8 of 8 <br />