My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-8357
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-8357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2011 8:34:57 AM
Creation date
1/12/2011 8:34:56 AM
Metadata
Fields
Template:
Building Department
Company Name
PRIMERICA GROUP ONE
Building Department - Doc Type
Permit
Permit #
08-8357
Building Department - Name
PRIMERICA GROUP ONE
Address
7810 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Marshal Bus (813) 780 -0041 <br /> Kerry Barnett Fax (813) 780 -0044 <br /> E- mail: kbamett(alfire.zephyrhills.fl.us <br /> Plan Review #: 08 -115 <br /> Project: Bldg "F" — Zephyr Commons <br /> Number of Pages: 5 <br /> Date: September 24, 2008 <br /> The plan review process has been completed for the sprinkler system located at 7810 Gall <br /> Blvd. and is allowed to move forward with installation at this time. I have provided my <br /> comments below that shall be complied with will in order to receive a sprinkler final <br /> (acceptance test), <br /> Should you have any questions, please contact me at the information above. <br /> 1. Installation shall be compliant with NFPA 13, 2007 Edition. <br /> 2. Install a 5" turndown Storz versus the standard 2 -2 /" FDC. FDC shall be <br /> placarded with 6" letters on contrasting background that is visible at night. <br /> 3. Underground for sprinkler system shall be installed by a certified fire <br /> protection company or company that carries the appropriate certification to <br /> install dedicated fire protection line (backflow preventor & fire line to riser). <br /> 4. System shall be tied into the building's fire alarm system. Tampers and flows <br /> shall be monitored. <br /> Inspection to be completed: <br /> 1. Pressure Test (sprinkler head location will be checked at this time) <br /> 2. Acceptance Test (completed in conjunction with fire alarm) <br />
The URL can be used to link to this page
Your browser does not support the video tag.