Laserfiche WebLink
2 <br /> Inspection Required: <br /> 1. Hood and duct shall have a light test (light provided by contractor) <br /> 2. Test and balance by third party <br /> 3. Acceptance test <br /> 4. Final (done in conjunction with fire suppression system) <br /> - A <br /> KE .,:r B ' TT, FIRE MARSHAL <br /> ** *Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals areas of non- compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />