My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-8912
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-8912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2011 10:49:39 AM
Creation date
1/12/2011 9:07:26 AM
Metadata
Fields
Template:
Building Department
Company Name
DIARY QUEEN
Building Department - Doc Type
Permit
Permit #
09-8912
Building Department - Name
DAIRY QUEEN
Address
37930 MEDICAL ARTS CT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• . <br /> ZEPHYRHILLS FIRE DEPARTMENT <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Chief Keith Williams Bus (813)780 -0041 Fax (813)780 -0044 <br /> FIRE SERVICE USER FEES <br /> Occupancy INo.: <br /> Plan No.: i of- 62-) Contractor: -5"e4. e . 44 <br /> Businss Name: 1 it- _ _ ■ Billing Address: 49 <br /> Rusin ss Address: y L ! , �� ' A: �, 33S - �5 -- <br /> Businss Phone No.: Billing Phone No.: <br /> Businss F4 No.: Billing Fax No.: <br /> Contact: Contact: <br /> PLAN REVIEW FEES _ INSPECTION FEES PERMIT FEE FALSE ALARM FEE <br /> — Site Ilan ' N/C _ Annual N/C Sprinkler $50 , 1st Alarm N/C <br /> Mufti- Framily /Commercial .06 sf _ 1st Re- inspection N/C Standpipes $50 , 2nd Alarm N/C <br /> (Minimum Charge $25.00 2nd Reins ion $100 ire Pum <br /> 0 p _ I $50 , 3rd Alarm N/C <br /> Plan Revisions DBL _ 3rd Re- inspection $250 Hoods 5 , 4th Alarm $100 <br /> _ 4th Re- Inspection $500 Fire Alarm •- a II 5th Alarm $150 <br /> _ SPRINKLER SYSTEMS (Business closed until LP Gas $50 ■ 6th Alarm $200 <br /> 0 - 25 Heads $50 violations corrected) Natural Gas $50 111 NON COMPLIANCE $150 <br /> _ 26 plus Heads $100 SPRINKLER SYSTEMS Fuel Tanks- per tank $50 <br /> STANDPIPE SYSTEM Hydro Undergrounds $45 Sparklers $100 <br /> 0 Per Riser $50 Hydrostatic Test $65 per system Fire Works $500 <br /> FIRE PUMP Acceptance Test $45 per system Camp Fire $25 <br /> 0 Per P.Imp <br /> ■ $100 Hydrant Flow 575 Controlled Bum $100 <br /> FIRE ALARM SYSTEM Hood/Duct $50 <br /> — 0 - 25 Devices $50 _ FIRE ALARM SYSTEM Place of Assembly $50 Annual <br /> 26 plus Devices $100 _ System Acceptance $50 Fire Protection $25 <br /> SUPPRESSION SYSTEMS _ Recall Acceptance $50 Flammable Application $50 Annual <br /> — Wet I $50 _ OTHER Waste Tire Storage $50 Annual <br /> Dry 1 550 _ Fire Wall/Smoke Wall $15 per wan Generator < KW $100 <br /> CO2 $50 _ LP Gas $25 per tank Generator >30 KW 150 <br /> )ther ! _ Natural Gas $25 per system Bio-Hazard Waste $100 Annual <br /> KITCHEN ESCHAUST Fumigation Tenting 550 <br /> 0 Hood/bucts I $50 Tent 10'x10' or greater $15 per tent Torch Pot/Applied $50 <br /> — OTHER Fire Pump $45 Haz. Materials $100 Annual <br /> LP !nstr is er tank $50 , Fire Suppression 30 <br /> _ Fuel Tank Installation $50 _ System Acceptance ��/ <br /> Per Tnk) $50 _ Exhaust Hood/Duct $30 <br /> 0 Natural Gas In allation $50 _ Re- inspection DBL <br /> (Per Sy tem) (other than annual) <br /> Spray Booth $50 0 Inspection scheduled DBL <br /> and cancelled Tess than <br /> 24 hours <br /> Construction Insp. N/C <br /> _ Emergency Vehicle Aa 1 FALSE ALARM <br /> NS TOTAL INSPECTION TOTAL 7 <br /> PLANS j C PERMIT TOTAL I ` TOTAL <br /> GRAND TOTAL 1 /3 -- 1 <br /> Comments: <br /> Date: 0'24 <br /> Inspgct r: ��•• /`f�'" <br />
The URL can be used to link to this page
Your browser does not support the video tag.