My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9054
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2011 8:15:37 AM
Creation date
1/13/2011 8:15:35 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
09-9054
Building Department - Name
MAJESTIC OAKS
Address
39548 AUGUSTA NATIONAL DR LOT 12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUMER TECHNOLOWE$, INC. Teri"icn 1•/417 <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THR <br /> MODEL +nnt •V .61D L a IrALNII,I,'f l AYt;TRDf_ <br /> MODE. 1101"Y' (!REPS 1-is) <br /> LONGITUDINAL ONLY FOLLOW STEPS 1-9 <br /> FOR AWAY* LATERAL ARM : Pllow Stags 10-10 <br /> FOR CONCRETE APPLJCA710NS: Fallow Stops 16.19 <br /> ENOINMele STAMP I*10114111R5 STAMP <br /> 1, SPECIAL. CIRCUMSTANCES: if the following condldone occur - STOP! Contact Oliver TbohnOIQ9iOs it 1- 800 - 284 -7437 : <br /> a) Pier height exceeds 48' b) Length of home Sx,.e^eeds 76' c) Roof eaves exceed 18' d) Sider/ail height exceed 96" <br /> e) Location is within 1600 feet of coast • <br /> )NST4ALL4TION OP GROU • PAN <br /> 2. Remove weeds and debris In an approximate two foot square to expose firm soli for each ground pan (0) . <br /> 3. Place ground pan (C) directly below chassis I.beare . Press or drive pan firmly irtta soil Until flush with or below aofl. <br /> SPECIAL NOTE: The longitudinal "V" brace system selves as a pier under the home and should be leaded es any <br /> other pier. It Is recommended gist after leveling, piers, and one-third inch (113") before home Is lowered cornpetely on <br /> to piers, complete steps 4 through 9' below then remove .jacks. <br /> 1INSTALLATION PL <br /> NOTE: WHEN METALLING THE LONGITUDINAL yerstany. A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REOUIREO, SOIL TEST <br /> PROBE SHOULD BE MEDIC OETERMEIE CORRECT TYPEOF ANCHOR PERSON. CLAe$IFICATION. IF PROBE TEST READING$ ARE BETWEEN <br /> tra a In A 5 FOOT ANCHOR MUST EIE USED. IP PROBE TtISY READINGS An BETWEEN 27611!00 A 4 FOOT ANCHOR MAY B1= U$ D. USE <br /> GROUND ANCHORS WITH DIAGONAL TIEi$ AND STABILIZER PLATES EVERY V4" . VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED . <br /> WITH VERTICAL TIE CONNECTION POiNTE (P0 FLORIDA REG) , <br /> 4. Se)ect the correct square tube . brace (E) length for set • up (pier) height at support location. (The 18" tube is always <br /> used as the •bottom part of the longitudinal arm). Note: Ether tube cart be used by itself, out one drilled to length es on es e <br /> 40 to 45 degree angle le maintained. <br /> PIER HEIGHT 1.25' ADJUSTABLE 1.30" ADJUSTABLE <br /> (Approx. 45 degrees Max.) Tube length Tube Length <br /> - <br /> 7 314' to 25` 22" 18' <br /> 24 3i4' to 321!4' 32" 18' <br /> 33" to • 1 <br /> 4(Y to • <br /> 5. Install (2) of the 1.50" square tubes (E (18" tube} ) 'Mottle 'U" bracket (J), insert oeariage bolt and leave nut loose for final <br /> adjustment. <br /> 6. Place t-beem connecter (F) tooeely on the bottom flange of Met-helm • <br /> 7. Slide the selected 125' tube (E) into 4 1,60" tube (E) and atelech to I-beam connectors (F) and fasten loosely with bolt and nut. <br /> & Repeat steps 6 through 7 to create the_'V" pattern cf the square tubes Loosely In place. The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9. After all bolts are tightened, secure 1.25" and 1.50' tubes using four(4) 1/4.14 x 3/4" self- topping screws In pre drilled hales. <br /> INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM 8YSTEN1 <br /> THE MODEL 1101 "V" (LowitruWNAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES a FRAME lies. <br /> NOTE; THE USE OP THIS SYSTEM R&QUIRE$ VERTICAL TIES SPACED AT Ore. <br /> FOUR FOOT (4') GROUND ANCHOR MAY o USED EXCEPT WHERE THE NOME MANUFACTURE! SPECIFIES DIFFERENT. <br /> 10. Install remaining vertical tie -down straps end 4' ground anchors per home manufacturer's instructions,•NOTI: Canterine <br /> anchors to be sized awarding to-soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of <br /> 4,000 lbs. require a 5' anchor par Florida Code. <br /> 11. Norm Each system is required to have a frame tie and stabilizer attached et eeoh lateral arm stabbing location. TMs frame tie 8 <br /> stabilizer plate needs to be located within 18' from of center ground pen. - <br /> 12. Select the correct square tube brace (H) length for set-up lateral transverse et support location. The lengths come in either 60' <br /> or 72' lengths. (With the 1.50" tube as the bottom tube, and the 1.26' tube es the inserted tube.) <br /> 13. install the 1.00 transverse brace (H)•to the ground pan connector (0) with bolt and nut: <br /> 14. Slide 125" transverse brace Into the 1.$0" brace and attach to adjacent i -beam connector (1) with bolt and nut, <br /> 15. Secure 1.59" vimayorse m'to 1.2r transverse arm ursine four (411(4" - 14 x 314" sail'- taoaina sorews in ore -drilled holes. <br /> • <br /> OLIVER TECHNOLOGIES, INC. 1Wephcner 931 795 <br /> 1- 500•284-7437 Fax: 93i•798-681 <br /> wewil olxerleolmologles.c>r^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.