Laserfiche WebLink
• <br /> 3.0 MONITORING <br /> Monitoring for any new settlement or distress should be conducted regularly. This monitoring can be <br /> easily performed by the resident and should consist of regular exterior inspections. A one year <br /> monitoring period (with minimum monthly observations) is recommended. If any additional ground <br /> subsidence or damage to the house is noted during this monitoring period, BCI should be contacted <br /> in order to evaluate the situation. <br /> Since some movement of the structure may continue for a period of time following grouting due to <br /> the re- distribution of stresses, consideration should be given to delaying final cosmetic repairs. A <br /> minimum waiting period after grouting of four months is recommended prior to initiating cosmetic <br /> repairs. <br /> Grout Monitoring Completion Report BCI Project No. 19- 17094.1 <br /> Barker Residence June 2009 <br /> Claim No. 3428 Page 5 <br />