5.3 Project Costs. <br /> A cost estimate for the proposed grouting program is presented below in Table 2. As shown, project costs <br /> are estimated at $65,824. It should be noted that these costs are estimated based on our experience with similar <br /> projects in the central Florida area. Costs for any needed structural or cosmetic repairs to the house are not <br /> included in this estimate. Actual, final project costs for the grouting may be lower (or possibly higher) after the <br /> project is subject to final design, competitive contractor bidding, and any modifications during implementation. <br /> Table 2 <br /> Estimated Project Costs <br /> Subsurface Compaction and Chemical Grouting <br /> Barker Residence <br /> Subsurface Compaction and Chemical Grouting Quantity Units Unit Cost Cost <br /> a. Contractor Mobilization 1 each $2,000 $2,000 <br /> b. Installation of Grout Casings 950 feet $16 $15,200 <br /> c. Grout Material (estimated) 190 cubic yds. $160 $30,400 <br /> d. Exterior Chemical Grouting 1 day $7,000 $7,000 <br /> (includes 500 lbs of material) <br /> e. Additional Polyurethane Material 400 lbs $13 $5,200 <br /> Subtotal = $59,800 <br /> Engineering Supervision Cost <br /> Inspection & oversight - estimated 6 to 8 days to estimated 6,024 <br /> complete grouting <br /> TOTAL ESTIMATED PROJECT COSTS = $65,824 <br /> In order to ensure compliance with the finding of this study and project specifications, we recommend <br /> that BCI be retained to evaluate the contractor bids and provide project monitoring and oversight services during <br /> the grouting operations. <br /> 6.0 LIMITATIONS <br /> The analysis described in this report is of sufficient scope to either identify or eliminate sinkhole activity <br /> as the cause of damage within a reasonable, professional probability. Our professional services have been <br /> performed using the degree of care and skill ordinarily exercised, under similar conditions, by reputable <br /> consulting engineers practicing in this or similar localities. <br /> The soil conditions indicated within this report are accurate with respect to the locations and extent of the <br /> soil borings. The findings presented in this report are based on the test borings drilled at the site, laboratory <br /> testing, and our professional judgment. Subsurface conditions different from those encountered during our <br /> exploration may exist. Opinions rendered regarding the house structure have been based solely on visual <br /> observations without benefit of any type of structural analysis, destructive or invasive testing to determine the <br /> structural integrity of concealed structural members, or review of design or construction drawings. No warranty <br /> regarding this investigation is intended, nor should any be implied. <br /> This report and information contained herein was prepared for the exclusive and specific use of Security <br /> First Insurance/Premier Adjusting Services. Any other use of this report or parts of this report shall be authorized <br /> in writing by BCI Engineers & Scientists, Inc. <br /> Subsidence Investigation BCI Project No.: 19 -17094 <br /> Barker Residence March 2009 <br /> Claim No.: 3428 Page 10 <br />