My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9186
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9186
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2011 8:26:05 AM
Creation date
1/14/2011 8:26:02 AM
Metadata
Fields
Template:
Building Department
Company Name
TYSON
Building Department - Doc Type
Permit
Permit #
09-9186
Building Department - Name
PRICHARD,LISA
Address
6145 9TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAUTION: Direct contact between pressure treated lumber, green, <br /> damp, and metal roofing must be avoided in order to prevent potential <br /> corrosion and moisture buildup. THE battens must be fastened to the roof <br /> deck with minimum #6 screws at 12" on- center or two mimnimum 8d common <br /> or pneumatic nails spaced 8" on- center or one every 4" on- center (or by <br /> applicable calculations according to ASCE 7 -98.) <br /> Battens must be installed to support the entire width and length of ridge, <br /> eave, hip, valley, and gable end trims. Battens are optional if re- roofing over <br /> shingles. <br /> Note: Re- roofing over shingles without a batten is allowed providing the roof <br /> has been checked by a licensed roofing contractor to insure levelness and <br /> pullout integrity. Put down 30# Felt with a 30" lap on Felt Paper. <br />
The URL can be used to link to this page
Your browser does not support the video tag.