Laserfiche WebLink
- 03/27/ 15:43 6785745790 BRIAN VAL.ENTE PAGE 01 .n <br /> * I L (F1 t3 <br /> • 4 " ., • 0 .1' , ._ TRCHNOLOSIES, INC. r <br /> e . �+• a FLORIDA <br /> INSTALLATION lMSI ICIti:TiDNS FOR THE <br /> t ,. <br /> e N , 1 5396 a ' <br /> ® ItICDSL lie!", <br /> i ° : ; Tr © (amps i -18) • } <br /> p u ; * 9 MODEL !lal.t"f! "QOM S7VOINRt ONLY <br /> • v . al AOt Lt3W STEPS f-9 <br /> . STATE OF . ' �c%o FORA LATERAL ARM: <br /> °� rgpnP Y; : <br /> Follow Sups 10"15 <br /> INKINNSERSSrum <br /> 1.8 . `• ..a " _ � E5. iI' he Towing cars occur - STOP! Contact Oliver Toch noko! , 1-800 -284 -7437 : <br /> a) Pier h'•'.' f ...14 48" b) Length of born exceeds 78' e) Roof eaves exceed 18" d) $ide■Ae1 height exceed 90" <br /> e) Local1cn is within 1 600 feet of coast <br /> 3. Remove ik' eiis end debris in an approximate halo foot square to expose firm soil for each ground pan (C) . <br /> 3. Place gtabrrd pan (C) directly below thesis I-beam . Press or drive pen firmly into soli urga flush with or below soil. <br /> SPECIAL IPIOTE: The tongitudinal "V" brace system serves as a pier under the home and should be loaded as any <br /> other pier it is recommended that alter levedng piers, and one -half inch (1) before Ire home Is lowered cry on <br /> to plane, c implete steps 4 through 9 below. <br /> NOTE: mew UNSTALUNG THE MODEL R f1O1.LW" t.DMtfft nitt4L SYST81u AltaX. A MINIMUM or 2 warren PeR FLOOR SECTION 15 <br /> REQUIRED- SOiL TEST PROBE s*tOULU SS US60 TO W IERMINE CORRECT TYPE DF AMQ Q PER-SOIL CLAasIFlCATION. iF PROBE TEST <br /> READINGS ARE R514VSEN 175 8 27S A 5 FOOT ANCAGR MUST BE U$6D. IF PRODS TEST RRADINOS ARE BETWEEN 475 ES B A 4 FOOT ANCMOE <br /> MAT BE USED. USE GROUND ANCi4ORS WITH DIAGONAL TiES AND STABILIZER PLATER EVERY 0'4" . VERTICAL TiES ARE ALSO REQUIRI? D ON <br /> HOMES SUPPLIED wm4 VERTICAL TIE CONNECTION POEMS (PER FLORMJA Ram) • <br /> 4. Select the correct square tube brace (E) length For set - up (pier) height at support I ooetbn. (The 'S" tube is always <br /> used es the bottom part at the longitudinal arm). Note: hither tube can be used by itself, cut and drilled to length as long as a <br /> 40 to 48 degree angle Is ma1Malr . <br /> PIER HEIGHT 1,25" ADJUSTABLE 1.50" ADJUSTABLE <br /> (Apprcx. 45 degrees Mex) Tube Length Tube Length <br /> 7 314" to 25" <br /> '. 18" <br /> 24 3/4" to 32 1/4" 32." 18" <br /> 33" to 41" 44" .. 113" i <br /> • to 18" <br /> a. install (2) of the 1.50" square tubes (E (fir tube) ) Into the "t1" bracket (J). Insert carriage bolt and leave nut loose for tine; <br /> adjustmart. <br /> 8. Place I connector (F) loosely on the bottom flange of the I bears. <br /> 7. Slide the selected 1.25" tube (E) Into a 1.50" tube (E) and tined', to I-beam connectors (F) eerid fasten loosely with bolt and nut. <br /> 8. Repeat steps 6 through 7 to create the "V' pattern of the square tubes loosely In place. The angle Is not to exceed 45 <br /> degrees end not below 40 degrees. <br /> 9. Ater eh bolts ere tightened, secure 1.25" and .1.50" tubes using four(4) 114 " - x 3t4" sett-Nipping screws in pre- drflted holes. <br /> ogrALLAncsioelaimmugmraemkmattsymagmafiyamm <br /> THE NOOEL lief "V" (LoRGITUDINAt. 5 LATERAL PROTRCTIDNI lEumetATES THE NSW FUR MOST STABILIZER PLATES ill. FRAME TIES. <br /> MOTE THE USE of THIS SYSTEM RsWRES YERRTIOAL TIES SPACBG AT r4". <br /> POUR FOOT (d'I GROUND ANCHOR MAY eE Mao 8XCEPT WHEFIE THE HONE NANUFAGT NIR 5P50JPIES KENT. <br /> 10. install remaining vertical tie -down straps and 4' gmunq anchors par home manufacturers ice. NOTE: Centerline <br /> am here to be sized awarding to soli torque condition, Any n enufactureir s specifications tor *lima anchor loads In excess of <br /> 4,000 lbs. MOMS e a 5' anchor. <br /> 11. NOTE? Each system is required to have a *erne tie and stabRter attached at each lateral terns g <br /> stabilizer plate needs to be Ioceted within 18" from of center ground pan. tebrlizin9 location. This frame fie 8 <br /> 12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The length corns in either 60" <br /> or 72' lengths, (With the 1.50" tube as the bottom tube, Arid the 1.25" tube as the Inserted tube.) <br /> 13. Install the 1.50 transverse brace (H) to the ground pen connector (D) with bolt end nut, <br /> 14. Slide 1.26" transverse brace into the 1.60' bra and attach to adjacent I connector ( I) with buit and nut. <br /> arm using • ur • • - • f • . Pr! T, ,., <br /> RµNUFACTURr b MOONS NS FOUNDATION STNTFMB TelanhpRe: 931- 79Q4SSrj <br /> ` ! ! A Idfill SeOr4 OF OLIVER <br /> 1- 0- 284.7437 TECHNOLOGIES, i[dC. Fax: 931-79138811 rxchn O refire <br /> tRwartRC)MrOpiae.cm <br />