Laserfiche WebLink
Hurlburt Construction Inc: 38647 Rose Lane - Permit # 8875 <br /> Y � <br /> SQ. FEET PRICE <br /> MAIN OR LIVING: 837 $ 96.83 <br /> OTHER AREA UNDER ROOF: - $ 91.00 <br /> OTHER: - $ - <br /> VALUATION $ 81,046.71 <br /> FEE SHEET $ 408.00 <br /> ADDRESS $ 30.00 <br /> DRIVEWAY_ $ 30.00 <br /> BUILDING: $ 476.16 <br /> ELECTRICAL: $ 91.80 <br /> PLUMBING: $ 61.20 <br /> MECHANICAL: $ 42.84 <br /> SUB -TOTAL $ 672.00 <br /> RADON: $ 8.37 <br /> TOTAL_ $ 680.37 <br /> SEWER: $ 1,909.50 <br /> WATER: $ 608.95 <br /> IRRIGATION: $ - <br /> TOTAL: $ 2,518.45 <br /> WATER METER: <br /> IRRIGATION METER $ - 'CREDIT FROM MH <br /> FIRE DEPARTMENT FEES <br /> PLANS TOTAL: $ 50.22 <br /> INSPECTION TOTAL: $ 15.00 <br /> PERMIT TOTAL <br /> TOTAL: $ 65.22 <br /> PUBLIC SAFETY IMPACT FEES <br /> POLICE $ 254.00 <br /> FIRE $ 273.00 <br /> 5% $ 26.35 <br /> TOTAL: $ 553.35 <br /> SUB -TOTAL $ 3,817.39I <br /> PARK IMPACT FEES $ 769.56 I <br /> SIF'S: $ 1,873.55 <br /> 100.0% $ 1,88.5 <br /> 1.0% $ 18.55 <br /> _ // ('J ✓ <br /> 1 1 � <br /> TOTAL: $ 1,873.55 l(Iit <br /> T I F 'S : $ 3,632.00 25% Tif due @ permitting $908 + permit cost $3,817.3 - 5.39 <br /> 99% $ 3,595.68 balance due before pre meter — (75% Tif) $2,724. + $2,643. - $5,367.11 <br /> 1% $ 36.32 <br /> TOTAL: $ 10,092.50 I <br /> P <br />