My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-8944
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-8944
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2011 3:41:39 PM
Creation date
1/14/2011 3:41:35 PM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
09-8944
Building Department - Name
FITGERALD CF & LIV TST & CHARLE & SHAR
Address
6320 SILVER OAKS DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> . ,. <br /> • • • <br /> 1. Pull force can be expressed as,fQlloVs: r , <br /> Pf.- S'x L <br /> Where: �� • <br /> . <br /> Pf is the pull out force. <br /> S is the strength, or retention force of the lag in lbs. per inch (from above). a <br /> :''' <br /> L is the length of thread that is imbedded in wood. <br /> • <br /> • <br /> Our 11 panel system•above will have 38 bolts, 1/4 " 4" securing -the panel frames to the <br /> roof system and into wood joists. The bolts will ruh through the retaining clips, having <br /> three inches of bolt 1eggth imbedded in the wood. The pull out force is calculated as ' <br /> follows: <br /> 260 x 3 = 780 x 38 bolts 29,640 lb. of retention force with wood at 0.55 specific • 1 F I 7 : { <br /> gravity. This pull out force is greater than the uplift force determined for our 11pn� anel J „4 r 4 , , . <br /> array. ' Fe than 11 panels may be used per collector array, since the anchorage is ffl . 1 •;' '• ' ' <br /> proportional to the number of panels in the array. Do not exceed 11 anels per arra as I � ', " 474' ' I '" I ' 1 <br /> this will degrade p • , b <br /> • <br /> =Pilot holes should always be drilled for lag bolts, to improve holding power. <br /> The pull pull out force of the thrust washer is .5 x 3.14159 x .125 x 60,000 = 11,775 lb. This <br /> pull out force exceeds the retaining clip bolt strength of 2209 Ib. You must use thrust ' I <br /> .asliers to prevent the bolt head from pulling through the clips. a <br /> w <br /> Where roofing materials require the use of roof jacks to allow the array to clear the <br /> • shingles or tiles, roof jacks should be made and spaced according to sheet 3 of the drawing. ng • <br /> set, and talled per the framed series installation instructions. With blocks spaced at 24 f <br /> ins <br /> . ;intervals, the. pull out of the stiinger arrangement can be expressed as above. Applying the <br /> same formula, each block has a retentipn capability of 3901b. x 3, or 1170 lb. The array . : <br /> will have an arrangement of stringers and roof jacks equal to the number of panels + 1, <br /> f~ • multiplied by the number o'stringers called for in the table located on sheet 3 of I <br /> drawing set for framed. series• collectors. <br /> • <br /> • . • , <br /> I have <br /> included a series of wofksheets that calculate the uplift forces and retention forces <br /> for an array' consisting of two to 11 panels, at a design pressure of 61.5 psf. This is the 0 } <br /> • design pressure for coastal communities to meet the 2003 code revision. Using the <br /> recommended number of attachment points in the charts for the number of collectors in a ° <br /> • given array will assure a wind.— safe•installation. • <br /> • • i <br /> . • S <br /> • I . . <br /> • <br /> r <br /> • 1 • • <br /> • i ■ <br /> • - . • a <br /> • <br /> • <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.