My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9527
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2011 2:51:18 PM
Creation date
1/18/2011 2:51:16 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
09-9527
Building Department - Name
JAPAGE PART C/O 7-EVELVEN
Address
38544 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Department of Environmental Protection - Division of Waste Management - Bureau of Petroleum Storage Systems <br /> • Petroleum Preapproval Program Work Order 34 <br /> Work Order Number: 2009- 93- W87007 Cost Center #: 37450404555 Category: 087888 FY 08 -09 <br /> FDEP Facility Id #: 51/8520046 Score: 75 Contract #: N/A <br /> Site Name: 7- ELEVEN FOOD STORE #16533 Eligibility: SCR <br /> Address (Street, City): 38544 5TH AVE. ZEPHYRHILLS County: Pasco <br /> Contractor Name: SHAW ENVIRONMENTAL INC. CID #: 01077 <br /> Contractor Address: 725 Us Highway 301 South. Tampa. FL 33619 FEID #: 77 -0589932 <br /> Contractor Representative: John K. Hansen. PG Phone #: 813/626 -2336 <br /> FDEP Site Manager: Sally J. Mcgregor Phone #: 850/245 -8896 <br /> Cleanup Phase: Remedial Action <br /> Cleanup Activity: SUPPLEMENTAL SITE ASSESSMENT <br /> Work Order Description: <br /> Per cost proposal dated June 17, 2009 (received June 18, 2009) and supplemental information received through July 15, 2009, with noted and <br /> discussed changes, Chapters 62 -160 and 62 -770, F.A.C., and Preapproval Procedures and guidance: <br /> Event 1: Redevelop monitoring wells (MWs) MW -8DD and MW -9R and monitor pH readings during and after the development. Install 2 MWs <br /> to 45 feet (ft) with 20 ft of screen and 1 soil boring (SB) to 40 ft or 1 foot into water table. During MW and SB installation, conduct continuous <br /> split -spoon sampling and screen soil samples 1 foot below land surface (Ws) and every 2 feet thereafter with an Organic Vapor Analyzer <br /> (OVA) to the borehole terminus. Collect a high unsaturated (vadose) zone soil sample from each MW and the SB according to the <br /> Preapproval Sampling Parameter Table (PSPT) to delineate extent of contamination. A minimum of 7 days after MW installation, sample 5 <br /> MWs for BTEX & MTBE, PAH and TRPH analyses according to the PSPT. The final deliverable will be two paper copies of a Supplemental <br /> Site Assessment Report with cumulative summary tables, conclusions and recommendations and electronic copies of tables and figures in <br /> Excel and CADD, as applicable. <br /> Note: Please see supplemental instructions (attached). <br /> Deliverable 1: `� 2009 Due Date 1: <br /> Deliverable 2: Due Date 2: <br /> Deliverable 3: Due Date 3: <br /> Deliverable 4: «_ _ _. Due Date 4: <br /> Deliverable 5: Due Date 5: <br /> Deliverable 6: Due Date 6: <br /> Final Deliverable: SUPPLEMENTAL SITE ASSESSMENT REPORT Final Due Date: Oct. 15. 2009 <br /> Period of Service: Contractor Representative Signature Date To April 13. 2010 <br /> Amount (incl. retainage): $16.925.13 Retainage (10 %): $1.692.51 <br /> This WORK ORDER is not in effect until signed by all parties. The FDEP will not pay any amount of this WORK ORDER until <br /> the original signed copy has been returned to the FDEP. The FDEP will not pay for any portion of the scope of work that has <br /> not been performed as of the date of Invoice. <br /> -- a dditional Terms An. Conditions On Following Pages- - <br /> / � 1 Date <br /> FDEP Site Manager: � �vi 7/15/2009 <br /> W ATITAIMS FDEP Manager: O . /I 4 9 <br /> Cost Center Administrator: / 1 Ara 7 /�dJ, <br /> Contractor Representative: v Wa-4/407 <br /> Contractor Representative: n <br /> (second contractor signature Is optional) <br /> FDEP Use Only: Technical review: Initials: Date: II, 09 <br /> Fiscal Review: Initials: 1 Date: a / d Dt? <br /> page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.