My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9322
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2011 8:29:41 AM
Creation date
1/24/2011 8:29:39 AM
Metadata
Fields
Template:
Building Department
Company Name
WEDGEWOOD MANOR
Building Department - Doc Type
Permit
Permit #
09-9322
Building Department - Name
VELEY,RICHARD & BETTY
Address
37418 TEABERRY LOOP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL -6 -2009 09:361 FROM:WILSON 8133542779 TO:3542779 P.1 <br /> M.R.Wilson LLC Roof and Repair Contractor <br /> 218 E. Bearss Ave. Suite 332 <br /> Tampa, Fl. 33613 Phone 81 I • 952 Fax 813 - 354-2779 <br /> State Licensed CRC003682 sly= ; 972 4e/e and Insured ,.. e . � zoo 7 <br /> Shingle Reroofing a j) � ����' x dr J, <br /> t > Js _rat- Y.2 <br /> Effective October 2007 Code changes are included in your estimate/contract as detailed <br /> below: <br /> Shingles are to be completely removed including old felt to expose wood deck. <br /> Wood deck must be renailed using ring shank # 8 nails 6 inches on center. <br /> New 301b. felt or approved equal must be installed using approved fasteners. <br /> New pre painted eaves drip metal in choice of color. <br /> New 26 gauge valley metal. <br /> New lead flashinglss on all vent pipes. <br /> New attic vent system. Requires one per 1000 square feet of roof. <br /> Shingles are nailed us 6 nails per ear shingle. <br /> All projects are d e upon completion including use of nail magnets and haul away of <br /> all debris from this construction. <br /> Permits and inspections as required are provided. <br /> Manufacturers and contractor warranties are provided at completion with final payment. <br /> Wood in need of replacement is additional charge of S _,C. f.7°° per sheet plywood and <br /> $ , per lineal foot of rafters or fascia. Wood replacement requiring removal \ t <br /> Aluminum or screen roof attachment will be charged time and materials. <br /> Initial <br /> ao <br /> JO Cd dex- <br /> d1 T /2 <br /> 9 40.1< <br />
The URL can be used to link to this page
Your browser does not support the video tag.