Laserfiche WebLink
i r_ii i <br /> Lab. Number 4581 <br /> April 8, 2005 <br /> Report Number 19 <br /> File Number 05 -116 <br /> Page 2 of 4 <br /> MATERIAL CHARACTERISTICS D-7007 <br /> Hardware: (continued) <br /> l Description Location <br /> Two 7 surface mount metallic keeper, with no I.D. marks one at fix <br /> ed meetg rail from each end <br /> Two 33 3/4" long vinyl balance cover, with no I. D. marks one at each flame j <br /> , 7 <br /> Two nylon block shoe clip, with no I.D. marks one at each frame jamb ~ <br /> Two 2 5/8" long vinyl vent stop, with no I.D. marks at each upper frame jamb <br /> Two metallic Eivot bar, with no I.D. marks <br /> Two <br /> o ne at each end of vent bottom rail <br /> tip Description <br /> Location <br /> Four 1" by 1/4" weep hole with plastic baffles at flame sill flange 3 %A ", 5 ", 48 %" and 49 3/4" <br /> Four 3/8" by l/8" weep slot at frame sill, 3 %" and 49 5/8" from Left <br /> Two 1" by 1/8 " weep slot at frame sill, 3 3/4" and 49 3/8" from left <br /> Muntins: None <br /> Mullions: None <br /> Reinforcement: One33 3/4" longah»ninum reinforcement, drawing No. 5114, inside vent jamb rait,(total oftwo). One <br /> 48" long aluminum reinforcement, drawing No.5103, inside fixed meeting rail. One 45 3/4" long aluminum <br /> reinforcement, drawing No. 5114, inside vent top and bottom rail, (total of two). One '/'/4" by 1/16" by 1 ' /z" Long <br /> aluminum plate, drawing No. 5115, at each end of fixed meeting rail fastened with the same size and type of assembly <br /> screws. <br /> Sealants: Fixed meeting rail at each end were sealed with a clear colored seam sealer. <br /> Pads: None <br /> Screen: Water resistance test conducted with and without a fiberglass mesh screen installed. <br /> Additional Description: The metallic pivot bats were fastened with two No. 6 by 1" flat head self drilling screws. <br /> Unit Installation: Test unit installed in a 2 x 12 pressure treated wood test buck with a 2 x 4 pressure treated buck strip. <br /> Frame installed with a single row of 10 by 2" pan head sheet metal screws at frame head and <br /> installation screws are as follows: frame head from the left, 6 5/8 ", 26 5/8 and 46 5/8"; frame jambs. <br /> the bottom, o <br /> 6 5/8 ", 20 % ", 34 1/8 ", 44 1 /8 ", 54 7/8" and 65 5/8 ". There were no installation screws n frames from the <br /> Product Markings: None <br /> OFFICIAL TEST RESULTS <br /> Paragraph Number Title of Test <br /> Measured Allowed <br /> 2.1.2 Air Infiltration Test: (ASTM E283 -96) <br /> at 1.57 psf 0.11cfm/sq.ft. (1.87 cmh/m2) 0.3 ( Passed <br /> 0.3 5.49) maximum <br /> Note: The tested specimen meets or exceeds the performance levels specified in specification reference <br /> for air infiltration. <br /> 2.1.3 Water Resistance Test: (ASTM E547- 96/E331) <br /> with and without screen, no leakage at 9.00 psf (431 Pa) Passed <br /> 2.86 ( 137) minimum <br /> 0101" ,4441 <br />