Laserfiche WebLink
ALLwO�gttA D c o ��DC CODE AgUtLD <br /> C <br /> I NG O <br /> Ak` <br /> v N11 0N �,ELEC 1 D ANCES <br /> CODE, ILLS Otw <br /> CITY <br /> 1j : 1 - <br /> - <br /> SCOPE OF WORK �e !, <br /> rs vrif <br /> East Building, North Section (North of Expansion Joint) <br /> East Building, South Section (South of Expansion Joint) <br /> Cwt <br /> 1. RemoveIi loose gravel, base flashings, wall flacbing coping caps, <br /> pitch pans, vents, drain flashings, soil stack flashings, eave drip and gutters. <br /> 2. Provide pull tests by independent party to determine proper fastener to <br /> use and fastening pattern. <br /> 3. Install first layer of Soprema's Soprafix SBS modified bitumen <br /> membrane mechanically attached with Trifixx or screws at laps and seal <br /> laps by heat weld method. <br /> 4. Install new lead soil stack flashings, drain lead, vents, scuppers, eave <br /> drip, coping caps with cleat for "high wind" design, pitch pans and skirt <br /> metal under rim of HVAC units at top of curbs. <br /> 5. Install .032 mils. painted aluminum flashings with standard colors <br /> chosen by owner. <br /> 6. Install new expansion joints and metal covers to protect them. <br /> 7. Install new spun aluminum breather vents, one per every 1000 sq. ft. of <br /> roofing area. <br /> 8. Install new aluminum retrofit drains to go over existing "aged" drains <br /> and flash into new roof system. Provide new drain strainer basket and <br /> "lock" into place. <br /> 9. Provide two layers of Soprema membrane at all curbs and wall base <br /> flashing areas. <br /> 10. Install Soprema's SBS modified bitumen cap sheet "Sopralene Flam <br /> Gran 180) PRGR membrane by heat weld torch application. <br /> 'd 69 1 '°N DINI1 1VDI43W V0I11014 14117:E 6007. 1 •unr <br />