My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10041
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 9:20:28 AM
Creation date
1/26/2011 9:20:26 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10041
Building Department - Name
WHITE,PATRICK & JOAN KAY
Address
5247 3RD ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w,�deb , .can er U-s- <br /> I V,lesl <br /> • <br /> WHENEVER A SPECIFIC PROBLEM ARISES, YOU <br /> CONSULT AN ATTORNEY. <br /> (Note: Upon payment in full by Contractor under the terms of this Agreement, and at the request of <br /> Contractor, Subcontractor shall supply a Final Waiver and Release of Lien Rights.) <br /> 1. General Project Description: Install (6) New Windows and (1) New Door at <br /> 5247 3 St. Zephyrhills, FL 33542 <br /> 2. Scope of Work. The specific work to be performed for construction of the <br /> Building under this Agreement of: <br /> • Window Manufacturer Installation Instructions and Technical Information <br /> • Remove and Haul Away Existing 2'8" Interior Wood Door Between Kitchen <br /> and Garage and Install New Pre -hung 2'8" 6 -Panel Steel Door with New <br /> Lockset and Deadbolt and New Door Casing on Both Sides. Note: Customer <br /> to Paint New Door and Trim <br /> • Remove and Haul Away (5) #23 and (1) Double #24 Mill Finish Existing <br /> Alum Windows and Install (5) #23 and (1) Double #24 White Single Hung <br /> 1/1 Alum. Flange with Double Pain Impact Glass New Windows. <br /> • Final Grade and Trash Cleanup Related to This Contract Only <br /> • All Structural Components Determined by Engineer of Record <br /> • NOTE: PAINT IS NOT INCLUDED IN THIS CONTRACT. <br /> And all shall be constructed in accordance with the Building's specifications, drawings, <br /> and to construction standards as referenced in the NAHB's Residential Construction <br /> Performance Guidelines, 2nd Ed., as reasonably inferable. <br /> 3. Terms of Agreement. The customer shall pay the Contractor the sum of Four <br /> Thousand Six Hundred Fifty and No 00 /100 Dollars ($4,650.00) for the work to be <br /> performed under this Agreement, subject to additions and deductions as agreed to by both <br /> parties. Unless otherwise specifically indicated in the Scope of Work, the Contract Price <br /> does not include costs of : (a) any governmental permits or fees, special permits, <br /> permitting service fee, surveys, engineered site or drainage plans, tests, landscape /tree <br /> permits or barricading requirements, or termite treatments (as required by Building <br /> Department); (b) electrical, mechanical, plumbing work, or connections to utilities, (c) <br /> any interior or exterior painting or floor covering; or (d) demolition, initial site <br /> preparation, dirtwork, fill, compaction tests, removal of obstacles, backfilling, or <br /> landscaping requirements. Any advance payments made by Contractor on Customer's <br /> behalf, for the items listed in Subsections (a) through (d), will be billed separately. If <br /> Contractor Determines that the services of a concrete pumper and concrete pumpmix <br /> material must be used for the concrete flatwork (slab) because of the inability of redimix <br /> trucks to access the Building site or due to the size of the slab, a fee of $750.00 will be <br /> charged for the additional service and material expenses. If Customer desires the slab to <br /> be "saw- cut," a minimum charge of $350.00 (for up to 200 linear of cuts) will apply. If <br /> Customer provides own site preparation and it is found to be out of grade at time of <br /> forming footer /slab, a call -back fee of $400.00 will be charged. If Customer moves <br /> location of building after slab formwork has begun, a fee of $800.00 will be charged. Any <br /> additional concrete flatwork ordered by Customer will be charged on a square foot basis <br /> se-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.