My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10080
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 8:57:02 AM
Creation date
1/27/2011 8:56:59 AM
Metadata
Fields
Template:
Building Department
Company Name
SIXTH AVE
Building Department - Doc Type
Permit
Permit #
10-10080
Building Department - Name
SIXTH AVENUE LLC
Address
5545 JENNIE ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 oral ttte d:r tram is s header with shit= Ind shat. end me <br /> kdhadt witlt >a 1 , to its ► fl t <br /> (Figure 7 -1) abxhgi the hinge lamb Ws. t header (Figure 10-1). Nal into pnxlrlan through the c,iara usa1g the <br /> 1Pd Inla ing nails (Figure 102). <br /> NOTE Leave the nab needs sticking out slightly (Figure 104) In case <br /> • <br /> they have to be moved meet: <br /> O- P7� 104 <br /> i <br /> 0 ;. �..� <br /> I sum.r. • tri liF: :4 11111 11 1 . 1 ' <br /> Rpm 74 <br /> OW '" ;.• ll) ; <br /> is <br /> Mar mil r ' CP It the door We net plumb, *qua door i <br /> ' (Figure 8-1), then nail Into position PIP" 10-1 <br /> through the shims using the 121 bnkMng rails _ _� <br /> • <br /> . (Rouge S-2. 8-3). '\ ' <br /> NOTE Leave the nail hearts Stlrachp out ID* <br /> 0 0 6 <br /> slightly ( Figure 8 In MEM they have to be <br /> moved later, <br /> 0 i 1 After the header, the 9Ide have boon eeound, hingegolomb <br /> badt end check twin cth. wth <br /> 1 <br /> , _ .. 1 . a ravel to be we noting has been moved, <br /> 111111 I�I <br /> v...---.0 4:iL set to oourtersInk it nails. (Figure 12 <br /> Nitta #1-9 10 <br /> ,E0 4 <br /> i as t 13-1 J- <br /> 1 Roues 4-2 - -- <br /> 1 Q Install 2W 010 ®anted <br /> r,J (OW (Rouse 13 -1) In each <br /> hinge (mew 6lduded) eking owe to <br /> , ..,,,,,, <br /> u check for plumb using the same 1 r 1 e I I i "-7i —r— go through a "' t _� <br /> procedures as In s�eps t5, 7, 8. Check to make � NOTE On special order's, doors with <br /> certain the door Md usnlPotmly against the . aidetros doors rhnnh transonic and it i <br /> veseMershipping along the strike lamb and double doom er <br /> ta dooa Waled asaantlNy <br /> threshold. The should the same as single was shown. It is <br /> nOrnIMIO agabhat the door. Neil Ma critical that rase units we khwteled <br /> home into po9hion lhlo g h the 0 through the outermost Munn. ,m ., aaso /MEW <br /> shins using the 120 Mashing <br /> hats (Figs* 9-1). Roam 18.1 <br /> NOTE: Leave the dad heads sticking . <br /> out I n 48 RPM E 2) 1 III -:. [i] 0 <br /> have to be moved Oar. <br /> l <br /> Flours 94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.