Laserfiche WebLink
PGT Industries <br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br /> A. DRAWINGS <br /> 1. Manufacturer's die drawings and sections. <br /> 2. Drawing No 6220, Sheets 1 through 5 of 5, titled "1" STD. Wall, Elevations <br /> Aluminum Tube Clipped Mullion, prepared by PGT Industries, dated 04 /28/00, <br /> with last revision on 05/30/06, signed and sealed by Robert L. Clark, P.E. <br /> B. TESTS <br /> I. Test reports on 1) Uniform Load Static Air Pressure Test, per FBC, TAS 202 -94 <br /> 2) Large Missile Impact Test, FBC, TAS 201 -94 <br /> 3) Cyclic Loading Test, per FBC, TAS 203 -94 <br /> along with installation diagram of a pair of fixed alum. windows (00 <br /> configuration) 60" x 54" mulled together with a lx 2 x std. wall mullion, prepared <br /> by Fenestration Testing Laboratory, Inc., Test Report No. FTL -2902, dated <br /> 01 /05/01, signed and sealed by Antonio Acevedo, P.E. <br /> "Submitted under NOA# 04- 0528.04" <br /> 2. Test reports on 1) Uniform Load Static Air Pressure Test, per FBC, TAS 202 -94 <br /> 2) Large Missile Impact Test, FBC, TAS 201 -94 <br /> 3) Cyclic Loading Test, per FBC, TAS 203 -94 <br /> along with installation diagram of a pair of fixed alum. windows (00 <br /> configuration) 80" x 76" mulled together with a lx 4x std. wall mullion, prepared <br /> by Fenestration Testing Laboratory, Inc., Test Report No. FTL -2903, dated <br /> 01/05/01, signed and sealed by Antonio Acevedo, P.E. <br /> "Submitted under NOA# 04- 0528.04" <br /> 3. Test reports on 1) Uniform Load Static Air Pressure Test, per FBC, TAS 202 -94 <br /> 2) Large Missile Impact Test, FBC, TAS 201 -94 <br /> 3) Cyclic Loading Test, per FBC, TAS 203 -94 <br /> along with installation diagram of a pair of fixed alum. windows with a transom <br /> lite (0/00 configuration) mulled together with a lx 2 x 3/4" wall vertical mullion <br /> and a 2 x 6" x 1/4" wall horizontal mullion, prepared by Fenestration Testing <br /> Laboratory, Inc., Test Report No. FTL -2975, dated 01/23/01, signed and sealed <br /> by Antonio Acevedo, P.E. <br /> "Submitted under NOA# 04- 0528.04" <br /> C. CALCULATIONS <br /> 1. Revised Anchor Calculations and structural analysis, complying with FBC -2004, <br /> prepared by PGT Industries, dated 05/30/06, signed and sealed by Robert L. <br /> Clark, P.E. <br /> Jaime D. G : on, P.E. <br /> Chief, Product Control Division <br /> NOA No 06-0125.06 <br /> Expiration Date: June 28, 2011 <br /> Approval Date: July 20, 2006 <br /> E -1 <br />