My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10149
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 10:25:28 AM
Creation date
1/27/2011 10:25:26 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10149
Building Department - Name
BARTHEL,RALPH & BETTY JEAN
Address
5516 16TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Va <br /> Ca <br /> Jw ophyrhins, Fl 33541 <br /> „. ) & (3 21' 567-8580 FOX: (8131 '15-48 <br /> DING AND ROOFING C,ONTRA.CTOR #CB-C;(6.1431' and -4 <br /> (41 ; omEs g BUSINESSES S' 976 www.schopercorishuction.corn <br /> Name J 2 ; <br /> —4- • ----- <br /> SID te <br /> Address <br /> CitytC lint <br /> - - <br /> _ <br /> We hereby prr to funiit-1 ['lab-vial:4 and labor necessary for the completion <br /> pyc-CPA Roofing System Proposal <br /> I Barricade off work area as nee..ded. <br /> 2. ReMOVC loose debris from flat roof. <br /> 3. Rem ove existing ilaslungs and boot as required. <br /> 4. Check substt decking for water damage. Replacement of decking will be done on a time and <br /> matetial basis at the rate of _ 0 dollars per man -hour plus materials marked <br /> up a contractor's fee. <br /> installinsulation, mechanically attached per manufacturers specification. <br /> 6. install PVC CPA membrane. <br /> 7 . install new boots. CUStOtla curb mid corners as required. <br /> install two-way vents as required. <br /> 9. Install term bar as required. <br /> Schaper Roofing, COMITli tm t to Qualtitv <br /> *All work shall be 'carefully supervised cox! conipleted by workmen -.lilted and knowledgeable in methods needed to <br /> produce high quality work. <br /> $The job site shall be kept dean daily for the duration of the job and the grounds shall be left dean of Al roof related <br /> debris a ffet completion. <br /> The yard shall be swept with a magnet <br /> 'The contractt r shall provide permit, workman compensation, and general liability insurance. <br /> °Carpentry, authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br /> perfornied CM a time and material basis unless otherwise agreed upon. <br /> • <br /> Page l of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.