Laserfiche WebLink
ROOF ASSEMBLIES <br /> Table R905.10.3(2). Minimum Corrosion Resistance. R905.12 Thermoset single -ply roofing. The installation of <br /> Reserved. thermoset single -ply roofing shall comply with the provisions <br /> of this section. <br /> 8905.10.4 Attachment. Metal roof panels shall be secured <br /> to the supports in accordance with this chapter and the man- <br /> R905.12.1 Slope. Thermoset single -ply membrane roofs <br /> ufacturer's installation instructions. Metal roofing fastened shall have a design slope of a minimum of one-fourth unit <br /> directly to steel framing shall be attached by approved fas- vertical in 12 units horizontal (2- percent slope) for drain - <br /> teners. The following fasteners shall be used: age. <br /> 1. Galvanized fasteners shall be used for galvanized R905.12.2 Material standards. Thermoset single -ply roof <br /> roofs. coverings shall complywith ASTM D 4637, ASTM D 5019 <br /> or CGSB 37- GP -52M. <br /> 2. Hard copper or copper alloy or 300 series stainless R905.12.3 Application. Thermoset single -ply roof shall be <br /> steel fasteners shall be used for copper roofs. installed according to this chapter and the manufacturer's <br /> 3. Stainless steel fasteners are acceptable for metal installation instructions. The approved allowable uplift <br /> roofs. resistance for the thermoset single -ply membrane roof shall <br /> I I 4. Aluminum -zinc coated fasteners are acceptable for be equal to or greater than the uplift resistance for the roof <br /> aluminum -zinc coated roofs. based on Table R301.2(2). <br /> 8905.10.5 Application. Metal roof panels shall be installed R905.13 Thermoplastic single -ply roofing. The installation <br /> of thermoplastic single ply roofing shall comply with the pro <br /> in accordance with this chapter and the manufacturer's <br /> installation instructions. The installations instruction shall visions of this section. <br /> state the allowable uplift resistance for the attachment sys- R905.13.1 Slope. Thermoplastic single -ply membrane <br /> tem. The installation of metal roof panels shall be limited to roofs shall have a design slope of a minimum of one - fourth <br /> roofs where the allowable uplift resistance is equal to or unit vertical in 12 units horizontal (2- percent slope). <br /> greater than the design uplift pressure for the roof listed in R905.13.2 Material standards. Thermoplastic single -ply <br /> Table R301.2(2). roof coverings shall comply with ASTM D 4434, ASTM D <br /> R905.10.6 Underlayment. Underlayment shall be installed 6754, ASTM D 6878, or CGSB /CAN /CGSB 37.54. <br /> as per manufacturer's installation guidelines. R905.13.3 Application. Thermoplastic single -ply roof <br /> shall be installed according to this chapter and the manufac- <br /> 905.11`Modified bitumen roofi4,The installation of modi- turer's installation instructions. The approved allowable <br /> Red bitumen roofing shall comply with the provisions of this uplift resistance for the thermoplastic single -ply roof shall <br /> 'section. be equal to or greater than the uplift resistance for the roof <br /> R905.11.1 Slope. Modified bitumen membrane roofs shall based on Table R301.2(2). <br /> have a design slope of a minimum of one - fourth unit vertical R905.14 Spra • d p i ane foam roofing. The installa- <br /> in 12 units horizontal (2- percent slope) for drainage. tion ay - , , . ! - - foam roofmg shall comply with <br /> " � ' <br /> 8905:11.2 Material standards:: Modified bitumen ISW • r og ..ec on <br /> Y • ' <br /> coverings shall comply with the standards in T Or .oP� � ,4,, . !� rethane fo roofs shall <br /> 8905.11.2. P N� m 12 un , :* .• a mi ■ um of one - fourth unit vertical <br /> s hor (2- percent slope) for drainage. <br /> TABLE R905.112 8905.14.2 Material standards. Spray - applied polyure- <br /> MODIFIED BITUMEN ROOFING MATERIAL STANDARDS thane foam insulation shall comply with ASTM C 1029. <br /> MATERIAL STANDARD R905.14.3 Application. Foamed in place roof insulation <br /> . Acrylic coating ASTM D 6083 shall be installed in accord. A, chapter and the <br /> Asphalt adhesive ASTM D 3747 ma ac •r . } Wag,. ss I, i'tli'S� � l squid- applied <br /> Asphalt cement ASTM D 3019 p ,e xonR905.15 shall <br /> b� a tt n /R4cu rE lian 72 hours fol <br /> Asphalt coating ASTM D 1227; D 2824 to ' p1a t4 g e. proved allowable <br /> Asphalt primer ASTM D 41 up s' n r4 ayed polyurethane foam roofing <br /> sh ' equal to or greater than the uplift resistance for the <br /> Modified bitumen roof ASTM D 6162; D 6163; D 6164; roof based on Table R301.2(2). <br /> membrane D 6222; D 6223; D 6298; <br /> CGSB 37 - 56M R905.14.4 Foam plastics. Foam plastic materials and <br /> installation shall comply with Section R314. <br /> :8905.11.3 Application. Modified bitumen roof shall be <br /> installed according to this chapter and the manufacturer's 8905.15 Liquid- applied coatings. The installation of liquid - <br /> installation instructions. The approved allowable uplift applied coatings shall comply with the provisions of this section. <br /> resistance for the modified bitumen roof shall be equal to or R905.15.1 Slope. Liquid - applied roofs shall have a design <br /> greater, than the uplift resistance for the roof based on Table slope of a minimum of one -fourth unit vertical in 12 units <br /> R301.2(2). horizontal (2- percent slope). <br /> 9.10 2007 FLORIDA BUILDING CODE - RESIDENTIAL <br />