My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10243
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:16:47 PM
Creation date
1/27/2011 2:16:43 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
10-10243
Building Department - Name
ZEPHYR COMMONS LLC
Address
7928 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZEPHYRHILLS FIRE DEPARTMENT <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Chief Keith Williams Bus (813)780 -0041 Fax (813)780 -0044 <br /> FIRE SERVICE , USERFEES <br /> Occupancy No.: . �j� <br /> Plan No.: lit - 8 /qj Contractor: / J O/Vz/2._ <br /> Business Name: Qr,1 07 C.&1-C Billing Address: 0 <br /> Business Address: 792- R ez;,a --of <br /> Business Phone No.: Billing Phone No.: � ' —® <br /> Business Fax No.: Billing Fax No.: <br /> Contact: Contact: . <br /> PLAN REVIEW FEES _ INSPECTION FEES _ PERMIT FEE _ FALSE ALARM FEE <br /> i tiii Site ite Plan N/C _ Annual N/C _Sprinkler $5D _ 1st Alarm N/C <br /> uni -Famiy /commercial .06 — 1st Re inspection N/C — Standpipes $50 ` 2nd Alarm N/C <br /> (Minimum Charge $25. ' = 2nd Re- inspection $100 Fire Pump $50 3rd Alarm N/C <br /> 0 Plan Revisions DBL _ 3rd Re- inspection $250 _ Hoods 550 _ 4th Alarm $100 <br /> _ 4th Re- inspection 5500 _ Fire Alarm 550 _ 5th Alarm $150 <br /> SPRINKLER SYSTEMS (Business closed until LP Gas 550 6th Alarm $200 <br /> _ <br /> _ 0 - 25 Heads $50 violations corrected) Natural Gas $50 _ NON COMPLIANCE $150 <br /> 26 plus Heads 5100 _ SPRINKLER SYSTEMS _ Fuel Tanks- per tank 550 <br /> STANDPIPE SYSTEM _ Hydro Undergrounds 545 _ Sparklers $100 <br /> 0 Per Riser $50 _ Hydrostatic Test $65 per system _ Fire Works $500 <br /> FIRE PUMP _ Acceptance Test $45 pe system Camp Fire $25 <br /> 0 Per Pump $100 _ Hydrant Flow $75 — Controlled Bum $100 <br /> FIRE ALARM SYSTEM _ Hood/Duct $50 <br /> 0 - 25 Devices 550 _ FIRE ALARM SYSTEM _ Place of Assembly $50 Annual <br /> _ 26 plus Devices $100 _System Acceptance $50 _ Fire Protection $25 <br /> _ SUPPRESSION SYSTEMS — Recall Acceptance $50 _ Flammable Application 550 Annual <br /> — Wet $50 OTHER , 2 _ Waste Tire Storage $50 Annual <br /> _ Dry $50 Fire Wall/Smoke Wall 47 per wall _ Generator < KM/ $100 <br /> _ CO2 $50 LP Gas $25 per tank — <br /> Generator >30 KW 150 <br /> Other $50 Natural Gas 525 persystem Bio-Hazard Waste $100 Annual — <br /> KITCHEN EXHAUST _ Fumigation Tenting $50 <br /> — <br /> 0 Hood/Ducts 550 _ Tent 10'x10' or greater $15 p er tent — <br /> Torch Pot/Applied $50 <br /> OTHER _ Fire Pump $45 — Haz. Materials $100 Annual <br /> LP Installation per t ank $50 — Fire Suppression $30 <br /> Fuel Tank Installation 550 _ System Acceptance <br /> (Per Tank) $50 _ Exhaust. Hood /Duct $30 • <br /> 0 Natural Gas Installation $50 _ Re - inspection DBL <br /> (Per System) (other than annual) _ <br /> 0 Spray Booth $50 El Inspection scheduled DBL _ <br /> and cancelled less than _ <br /> _ 24 hours <br /> Construction Insp. N/C <br /> _ Emergency Vehicle Act $50 _ FALSE ALARM <br /> PLANS TOTAL '— INSPECTION TOTAL PERMIT TOTAL TOTAL <br /> �- -} GRAND TOTAL <br /> 1 /O Z.` 1 <br /> Comments: • <br /> Date: 2 <br /> / — 40 InsA l gctor: r d <br />
The URL can be used to link to this page
Your browser does not support the video tag.