My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10264
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 3:22:20 PM
Creation date
1/27/2011 3:22:19 PM
Metadata
Fields
Template:
Building Department
Company Name
WEDGEWOOD MANOR
Building Department - Doc Type
Permit
Permit #
10-10264
Building Department - Name
DUFFY,WM F & TERESA F
Address
37347 DERBYSHIRE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Pect",A- <br /> T S4 ELINIANN <br /> Rpofiu'g, Inc. <br /> RESIDENTIAL • MOBILE HOME • COMMERCIAL <br /> 12630 Curley Street, Suite 104 • San Antonio, FL 33576 <br /> Phone: 352 -588 -0910 • Fax: 352 -588 -0911 <br /> LIC# CBCO58155 - LIC# CCC1326166 <br /> www.neuman n roofs.com <br /> March 18, 2010 <br /> Re: Re -roof Proposal ��� $y /1" <br /> Theresa Duffy Y <br /> 37347 Derbyshire Drive <br /> Zephyrhills, FL 33542 <br /> 813- 783 -8761 <br /> Neumann Roofing, Inc. proposes to furnish labor, material, supervision, equipment, fees and <br /> other costs related to the completion of the subject property; specifications listed below: <br /> 1. Record NOC and obtain all required permitting. <br /> 2. Tear -off existing roof system down to deck substrate and re -nail roof deck to meet <br /> State Of Florida Building Code. <br /> 3. Provide and install new 30# felt underlayment, nailed to meet local code requirements. <br /> 4. Provide and install new drip edge around entire perimeter, matching the existing face <br /> dimension. Color: IJM'ri <br /> 5. Provide and install new GAF/ELK starter strip at drip edge system. <br /> 6. Provide and install a new 30 -year GAF/ELK Timberline Prestique high definition <br /> shingle with stain guard. Color: <br /> 7. Strike lines to ensure a uniform shingle installation. <br /> 8. Provide and install 40-feet of TAMKO shingle -over ridge vent on ridges. Vent will be <br /> covered with ridge cap shingle to match roof system. <br /> 9. Provide and install 59 -feet of GAF/ELK SAR (30 -year shingle, not 3 -tab) ridge cap. <br /> 10. Provide and install new 16" valley metal in all valleys. <br /> 11. Provide and install 3 new lead boots at plumbing vents; painted to match shingle color. <br /> 12. Sweep magnets around the perimeter area of work to collect loose nails, staples, and <br /> other various scrap sheet metal components. <br /> 13. Haul away all roof - related debris. <br /> 14. Our liability insurance coverage is based on completed operations. <br /> 15. Provide a 20 -year GAF/ELK weather stopper system plus limited warranty with <br /> upgraded wind warranty up to 110 MPH (Free of charge). <br /> 16. Provide a 5 -year workmanship warranty. <br /> FL. Contractor #: CCC1326166 GAF LI GAF -ELK License #: ME12709 Pr—,f7). al <br /> 12630 Curley Street- Suite 104• San Antonio • Florida • 33576. Ph: (352) 588 -0910 • Fax: (352) 588 -0911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.