My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10314
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 10:46:21 AM
Creation date
1/28/2011 10:46:19 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
10-10314
Building Department - Name
MAJESTIC OAKS LLC
Address
39649 COG HILL LP LOT 86
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-213/27,' 2007 25: 43 5785745700 BRIAN VALEN i E PAGE 01 <br /> "- <br /> e n <br /> it. ^ ♦e � l F ! C .� ■ t <br /> P <br /> a ` aLtVER TECHNOLOGIES, NM f' <br /> LORIOA Hr9t/U.trt17CN sisTRUGoDNS FOR ma <br /> Xs N o. 15396 0 lltl7 7 H " • s .�• ,.. <br /> i'* ; • i MODEL 11 i1"v" osTarks 1.18) <br /> A 2 ' 5100f1. 1101. V"1.O ONLY FOLLOW arePs 1-0 <br /> Ai <br /> ✓ ;u7ATE OF / {!. FOR ADDING LATPRAt ARM : <br /> �() MAIM .... 4!' i Poem Sawn 1045 <br /> 1. S • -, °' g1 VA SS: if the following conditions occur - STOP! Contact Oliver Techrno!bg . - 1 a) Pier h - $ 48' b) Length of !some exceeds 76' c) Roof eaves exceed 18" d) $ldewaI height exceed 98" <br /> e) Location le wlthtn 1500 feet of coee% <br /> 1N. STALLATaQN AF D PAN <br /> 2. Remove slvrleds end debris in an approximate two foot square to expose firm soli for each ground pan (C) . <br /> 3. Place grokind pan (C) directly below chassis I -bsarn . Press or drive pan flrndy Into son until fah with or below soil. <br /> SPECIAL (NOTE: The longitudinal 'V' brace system serves sea pear under the home and should be loaded as any <br /> other per pier.i It is recommended that after leveling pears, and one -half inch (1/2) before home is lowered completely on <br /> to plea, complete steps 4 through 9 below. <br /> iNSTALLISIKKQEMMIONALMENIfirafiyM <br /> NOTE: WHEN iNSTALUNG THE MODEL 01,01d. a~GNNITUDINAL SYST ag A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION 15 <br /> REQUIRED- SOIL TEST PROSE SHOULD U U$NQ TO DETERMINE CORRECT TYPE OF ANCHOR POEM. CLASSiFICAT10N. IF PROBE TEST <br /> READINGS ARE BETWEEN 172 5 2TS A 1 FDCT ANCHOR EMT B8 USED. IR PROSE TEST READINGS ARE et=TwEEN 2755 We A 4 FOOT ARCHON <br /> MAT 8E USED. USE GROUND ANCHDRB %WM DIAGONAL TIES AND STAMMER PLATES EVERY $4" , VERTICAL TiES ARE ALSO REQUIRED ON <br /> NOMES SUPPLIED Verne VER71CAL TU CONNECTION Poem fOER FLORIDA MG.) . <br /> 4. Select the correct square tube brace (E) length for set - up (pier) height at support location. (The '8" tube Is always <br /> used es the bottom part of the tongitudlnal arm). Note: Either tube can be used by itself, cut and drifted to length as long as a <br /> 40 to 46 degrese angle is maintained. <br /> PIER HEIGHT 1,25" ADJUSTABLE 1.50" ADJUSTABLE <br /> (Apprrx. 45 degrees Mex) Tube Length Tube Length <br /> 7 3/4" to 25" 2r 18' _` <br /> 24 3/4" to 32 1/4" 32" 15" <br /> 33" to 41" 44" - f" i <br /> = e to _ ` ' 1 <br /> 5. hsst&t (2) of the 1.50" square tubes (E {18" tube} ) into the - U" bracket (J). insert carriage bolt and leave nut loose for final <br /> a justrner-t, <br /> 6. Place I connector (F) loosely on the bottom flange of the i- beuam. <br /> 7. Slide the selected 1.26" tube (E) bap a 1.50" tube (E) and attach tot-beam connectors (F) end fasten loosely with bolt and nut. <br /> 8. Repeat steps 6 through 7 to create the "V' pattern of the square tubes loosely In place. The angle is rsot to exceed 45 <br /> degree end not below 40 degrees. <br /> 9. After a2 bolts era tightened, secure 128" end 1.50" tubes using four(4) 114' -14 x 314' sett tappi g screws in pre- drilled holes. <br /> )R1[ALLATtDN OP nTrom T,er m.,s,. . <br /> THE MODEL lire "V" (LONGITUDINAL A LATERAL PROTECTION) 5UM•NATES TH5 NEW FoR MOST 5TA9tu2ER PLATee$ & FRAME TIES. <br /> Norte 'FIE sea or Tine Mao RMQuIRES VIIRTIcAi. TIES SPACED AT 8'e ", <br /> Rourt POOT (4') *ROUND Asc:Non MAY 15 usRO EXCEPT WHERE THE HOME MANUFACTURER SPffClfI9;3 DIFFERENT. <br /> 10. install remaining vertical tie -down straps and 4' ground anchors per hearse manufacturers instructions. NOTE: Centerline <br /> anchors to be elzed scootJing to soil torque condition. Any mentfecturel'S specifications for sidewell anchor loads in excess of <br /> 4,000 lbs. require ea 5' anchor. <br /> 11. NOTBt Each system is required to have e *erne tie and alabaster ached at each leterei erm stabilizing location. This frame tie & <br /> stabilizer plate needs to be located within it from of center ground pan. <br /> 12. Select the oorreot square tube brace (H) length for lateral transverse at support locatbn. The lengths come In either 60" <br /> lengths, (WM the 1.30" tube as the bottom tube, and the 1.25" tube as the inserted tube.) <br /> 13. Instal the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. <br /> 14. Slide 1.26" fransveree brats into the 1.50" brat* and attach to adjacent I-beam connector (1) with bolt ono nut. <br /> . • • . e , . e ' . r. r -r-r ?" _; -r_ <br /> • IVANUFACTUNND HOMING <br /> rm rag .--7• _. • `gr • ° -ors n ■ '- :' :, o <br /> A D OP OL VER 'BOG Fox: r: 9317 5.5 asar asst, <br /> 1.81)9 "x84.7437 ' INC. uU ss1-T9e ee 1 t <br /> taOhilMogiee.c rn <br />
The URL can be used to link to this page
Your browser does not support the video tag.