Laserfiche WebLink
-03/271` 15: 42 5785745700 BRIAN VALEN T E PAGE 01 <br /> e ' j FJ <br /> q . - . I F r L' „ • f . ] � + OLIYRIt TECttNOLOGtBa, NM f f <br /> e .'� A ■ 1° OA INQf/U.4ITIGN tN*TRUGTlo.5 FOR The <br /> � No. 15396 irk McSh i+st als l e • <br /> 1 *■ : fir: M�EL t1e» v �!* • T e1.1s ,? <br /> " : * 1 MOORI- LOWGJfJDINAL ONLY <br /> ,.� ; D." FOLLOW STEPS 1-5 <br /> STATIw OF �'! {j. FOR ADDING LATERAL ARM: <br /> ' p vr aar {r .; Faller sine 1045 sa+ +eeee Sum • <br /> 1. SP u• g ..; ES: If the following conditions occur - STOP? Contact Oliver 'i .. .. ..: 14100. 284 -7437 <br /> a) Pier h .... - 48" b) length of !some exceeds 78' e) Roof eaves exceed 16" d) SidevrmN height exceed 96" <br /> e) Location is within 1500 feat of coast <br /> rnSTALLAT1ON AF f JD PAN <br /> 2. Remove Weeds amt debris in an approxtmt to two foot squers to expose firm soli for each ground pen (C) . <br /> 3. Piece grokertd pan (C) directly below chessie I -bearn . Press Or drive pen firmly into soil untl Hush with or below soil. , <br /> SPECIAL !HOTS: The longitudinal " e' brace system serves as a per under the hone and should be loaded as any <br /> other pier.: it Is recommended that after levtang piers, and one -half inch (1/2') betbre home is lowered completely on <br /> to plans, complete steps 4 through 9 below. <br /> 1N$TALLA11OUt <br /> NOTE: WHEN )NSTALUNG 7711 M0O&L 0 1191.4-"V" tome vaNAL SYSUM max. A 1554SIOM OF 2 SY8aEM8 PER FLOOR SECfDN t8 <br /> REQUIRED. SOIL TEST PROBE SHOULD BS USED TO DETERMINE CORRECT TYPE OF ANCHOR PER tat CLA8SIFICATION. IF PROBE TEST <br /> READINGS ARE ISSITTEEN 173 a 276 A 6 FOOT ANCHOR MUST BE MOAN PROS TESL' NRADtNes AID BETWEEN 278 a SW A 4 FOOT ANCHO8 <br /> MAT BE USED. USE GROUND ANCHORS WITH DIAGONAL TIES AND STABILE= PLATES EVERY 8A' . VERTICAL TIES ARE ALSO REQUIRED ON <br /> HONES SUPPLIED Wow VERTICAL TIE CONNECTION POINTS peen FLORIDA Res.) . <br /> 4. Select the correct aquae tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always <br /> used as the bottom pert of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a <br /> 40 to 45 degllae angle is malntahed, <br /> PIER HEIGHT 1,25" ADJUSTABLE 1.50" ADJUSTABLE <br /> (Apprcx. 45 degrees Max ) Tube Length Tube length <br /> T 314" to 25" 18 " <br /> 24 3/4" to 32 1/4" 32' 18" <br /> 33 " to41" 44" 18" i <br /> e t ,r' fi ..... <br /> _ 18" <br /> _ <br /> 5. PnstaH (2) of the 1.50" square tubes (E {18" tube)) into the "0" bracket (J), Insert carriage bolt and leave nut loose for fine <br /> adjustmert. <br /> 6. Place 1 -beam connector () toosety on the bottom flange of the I - beam. <br /> 7 - Slide the selected 1.25" tube (E) trap a 1.50" tube (E) and attach to I-beam cony (F) and fasten <br /> 8. Repeat steps 8 through 7 to create the "V' pattern of the square tubes t loosely exceed bolt and nut. <br /> Yin place <br /> degree end not below 40 degrees. . The angle is not to exce d5 <br /> 9. After alt bolts are tightened, secure 125" and 1.50" tubes using four(4) 114 " -14 K 314" sett-tapping screws in pre-drilled holes. <br /> tN5TALLATION ( LA r 1 A Cr ee crr•o . <br /> THE 80011 1101 "V" (LoNGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NESO FIR MOST STABILIZER PLATES A FRAME TIE8. <br /> NOM THE 1181 OR THIS SYl71IM ROES 8515T1CA1. TIES 8PACtIO AT 5'4 ". <br /> P0118 P007 (.') *ROUND ANCMOI! MAY 85 uaelo IIXCEPT WHERR THE HOn MANUFACTURER SPECIFIES DIFFERENT. <br /> 10. install remaining vertical tie-clown tamps and 4' ground anchors per home rrienufectulsr'�e Instructions. NOTE: Centerline <br /> anchors to be sized a000rding to soil torque condition. Any manufscbrer's specifications for *Jewell anchor loads in excess of <br /> 4,000 lbs. require a 5' anchor. <br /> 11. NOT& EaCh system 13 requbad to have a frowns tie and stabllzer attached et each <br /> stabilizer plate needs to be toasted within 18' from of center ground pan, ttll9r9l elm stabilizing location. This frame tie & <br /> 12. Select the correct square tube brace (H) length for seterp lateral transverse at support location. The lengths came In either 60" <br /> 93, ir►. tee ngths, <br /> tans e1 r N to 10 tube, and the 125" tube es the tube.) <br /> 14. Side 1,25" transverse brace into the 1.50" brace end attach toad ac l I bolt ersd nut. • <br /> IS. bOOUto tets"'lySnsverse - ever to �1.� a :T t ( -bean! . --: ctor (i) with bolt ant nut. <br /> • NMMN UFACTunwo Noumea FOUNDATION SYsrass Tetephan9: 831 -7ti6 d56r,, <br /> A OMt91ON OF OLIVER TECHNOLOGIES, INC. Fox: 931-796.881f <br /> 1 - X9"284.7437 WWW.01hOrtach 018.Wn <br />