Laserfiche WebLink
813-780 -0020 City of Zephyrhills Permit Application Fax- 813 -780 -0021 <br /> Building Department <br /> Date Received Phone Contact for Permitting <br /> i t t i t Ni I I I I I I I tI_t_IiIT_ <br /> Owner's Name k (• \1--- 1 111 Owner Phone Number <br /> Owner's Address - ci E va I T ptu 5 br - Owner Phone Number <br /> Fee Simple Titleholder Name L Owner Phone Number <br /> Fee Simple Titleholder Address <br /> JOB ADDRESS , `2_- LOT # <br /> Y J <br /> SUBDIVISION » 1\` PARCEL ID# Q2- —2;4 "(Y - Yo- 00000 -1 0/cj 0 <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> WORK PROPOSED NEW CONSTR ADD /ALT SI N I I MOVE 1 1 DEMOLISH <br /> INSTALL REPAIR I COT <br /> USE 11 SFR 1 1 COMM 1 1 OTHER 1 I <br /> TYPE OF CONSTRUCTION 1 >CJ BLOCK " � 1 1 FRAME 1 I STEEL 1 I OTHER I 1 <br /> WORK DESCRIPTION OF WOR V 001 W f S I kC S <br /> BUILDING SIZE SQ FOOTAGE 0 VA HEIGHT <br /> 1 BUILDING $ VALUATION OF TOTAL CONSTRUCTION <br /> I 1 ELECTRICAL $ AMP SERVICE 1 1 PROGRESS ENERGY n W.R.E.C. <br /> I PLUMBING $ <br /> 1 <br /> 1 1 MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION <br /> I GAS ROOFING 1 1 SPECIALTY 1 I OTHER <br /> FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA 1 'YES Ti No <br /> BUILDER COMPANY <br /> SIGNATURE REGISTERED I Y/ N 11 FEE CURRENT 1 Y/ N 1 <br /> Address License # <br /> ELECTRICIAN COMPANY <br /> SIGNATURE REGISTERED 1 Y / N 1 FEE CURRENT 1 Y / N 1 <br /> Address I License # <br /> PLUMBER COMPANY <br /> SIGNATURE REGISTERED I Y/ N 1 FEE CURRENT I Y/ N 1 <br /> Address License # <br /> MECHANICAL COMPANY <br /> SIGNATURE REGISTERED 1 Y/ N 1 I FEE CURRENT 1 Y/ N 1 <br /> Address 1 License # <br /> OT 4,i3 MI � , # COMPANY �y �� , �o r � ` <br /> SIG • . REG ISTERED 1 1/ N 1 FEE CURRENT I Y/ N 1 <br /> r. <br /> Address G -1 1 • License # raC 1` Z ...S <br /> I <br /> RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R -O -W Permit; for new construction, <br /> Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, <br /> Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions /large projects <br /> COMMERCIAL Attach (3) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R -O -W Permit for new construction. <br /> Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, <br /> Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance <br /> SIGN PERMIT Attach (2) sets of Engineered Plans. <br /> * ** *PROPERTY SURVEY required for all NEW construction. <br /> Directions: <br /> Fill out application completely. <br /> Owner & Contractor sign back of application, notarized <br /> If over $2500, a Notice of Commencement is required. (AIC upgrades over $5000) <br /> ** Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMITTING (Front of Application Only) <br /> Reroofs Sewers Service Upgrades A/C Fences (Plot/Survey /Footage) <br /> Driveways -Not over Counter if on public roadways..needs ROW <br />