My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10349
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 11:31:34 AM
Creation date
1/28/2011 11:31:33 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10349
Building Department - Name
SHAY,DAVID & BRENDA
Address
4625 WISTERIA DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-3 17S7 <br /> • <br /> r , T te. a`too �� sh " 'y 1( <br /> � ® �h��L 4cc��i�ZGf <br /> A Division of Ryman Construction, Inc. p o p 51 <br /> License # CCC 1325505 <br /> ustomer: David Shay Date: 3 -9 -10 <br /> Address: 4625 Wisteria Dr. Zephyrhills, FL. 33541 <br /> Contact Numbers: Home: Cell: 1- 931 - 374 -1347 <br /> Job Description: <br /> 1. Perform complete tear off of existing shingles <br /> 2. Re -nail deck according to Florida Code <br /> 3. Dry-in pitched roofs with #30 felt paper <br /> 4. Install new 6" drip around perimeter of roof deck Color: DV t.c/^ <br /> 5. Install all new lead boots <br /> 6. Install all new general roof vents <br /> 7. Install new 30 year fungu resistant shingles <br /> F t <br /> 8. Brand: Tamko Color: s c_ 1A•■C\COrl <br /> 9. Install 60lf of aluminum ridge vents (existing) Color: BIvL•rrN <br /> 10. Build cricket behind chimney per code to divert water from back side of chimney <br /> 11. All roof related debris removed from job site <br /> 12. All materials, labor, and permits furnished <br /> Additional Notes: Contract pending finance approval <br /> Additional Items: Bad '/" plywood /OSB will be replaced at a cost of $1.60 sq. ft. in the roof field. All other <br /> wood work/additional labor such as, but not limited too, metal substrate repairs, rafter replacement, fascia <br /> board replacement, 1x decking replacement, etc. will be charged at an hourly rate of $55.00 per man hour <br /> plus the cost of materials. (L 3 )(_ate <br /> Payment to be made as follows: 25% down, balance upon completion <br /> Payment Method: <br /> Total Bid $5,770.00 (x•IS) (x <br /> Cash Down $2,500.00 <br /> Amount of credit requested $3,270.00 <br /> This becomes a binding contract upon acceptance of proposal. Purchaser acknowledges a copy of this contract. <br /> 1. All material is guaranteed to be as specified and completed in a substantial workmanlike manner. <br /> 2. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, hurricane and other necessary <br /> insurance upon above work. <br /> 3. Labor warranty does not cover damage to roofs caused by lighting, hurricane, tornado, hailstorm, impact of foreign objects or other <br /> violent storm or casualty damage to roofs due to settlement, distortion, failure or cracking of roof deck, walls or foundation of a <br /> building. <br /> 4. Workmen's compensation and public liability insurance on above work to be taken out by RYMAN ROOFING or its sub- <br /> contractors. <br /> 5. RYMAN ROOFING, INC. is not responsible to provide any materials or to perform any work other than what is described above. <br /> Replacement of deteriorated decking, fascia board or any other additional materials/labor that maybe needed and is not described <br /> above will be charge as an extra unless otherwise stated herein. <br /> 6. This contract is subject to final approval by RYMAN ROOFING, INC. and is the entire agreement of the parties and no other <br /> written or other forms will be recognized. <br /> 7. A charge of 1.5% will be made on all unpaid balances after 30 days plus attorney's fees. <br /> 8. A 4% processing fee will he added to all credit card orders. <br /> This proposal may be withdrawn by Ryman Roofing if not accepted in (30) Days * Prices subject to change without notice unless <br /> proposal has been accepted by both parties <br /> "Me above prices, specifications and conditions are satisfactory and are hereby accepted. You are <br /> Authorized to do • 7 , r - : pecitied above. <br /> Date: ,._)./V/10 Signature: <br /> Date, 1f 1 Estimator: <br /> Ryman Roofing, Inc. will not be held responsibl • ' r any satellite signal loss, septic tank, sod, shrubliery, part t, concrete, pavement, <br /> sidewalk, gutters, down spouts, screening of any type, and/or any other type of piping damage that may occur from the above referred <br /> job. <br /> 36413 SR 54 • Zephyrhills, Florida 33541 • Telephone: 813 - 782 -6094 • Fax: 813- 788 -6773 <br />
The URL can be used to link to this page
Your browser does not support the video tag.