My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10387
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 8:11:53 AM
Creation date
1/31/2011 8:11:47 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10387
Building Department - Name
BOLENDER INVESTMENTS INC
Address
4918 AIRPORT RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 4 — System Installation <br /> Page 4 -14 <br /> REV. 2 <br /> • MAIN /RESERVE SYSTEM <br /> When a reserve system is being utilized, two 1 in. swing <br /> check valves, Part No. 417788, must be installed in the dis- <br /> tribution piping network. They should be positioned as close ■ <br /> as possible to the "Y" fitting joining the piping from the main <br /> and reserve tanks to one common supply pipe. See Figure <br /> 4 -28. Note: Make certain to install swing check valves in the <br /> direction of dry chemical flow as shown with an arrow <br /> stamped on the valve body. <br /> • <br /> „ IN. (30.5 cm) <br /> SWING CHECK <br /> VALVE MAXIMUM 12 TO 15 IN. <br /> MAIN SYSTEM (30.5 to 38.1 cm) <br /> SUPPLY PIPE FROM <br /> TANK VALVE <br /> � ( $ s 4 5° r � _- <br /> BRANCH RESERVE ` DISTRIBUTION SYSTEM SUPPLY PIPE FROM TANK PIPING TO <br /> VALVE � NOZZLE(S) <br /> 111.1111111.00) ► Figure 4 -29. Pressure Switch Installation. <br /> 003025PC <br /> Figure 4 -28. Main/Reserve System. SYSTEM CHECKOUT AFTER <br /> INSTALLATION <br /> PRESSURE SWITCH INSTALLATION <br /> 1. Model MCH3 /NMCH3 Mechanical Control <br /> The Model PS- SPDT -X Pressure Switch is available for use Head. <br /> when an electrical output is required. It must be installed in <br /> ►the discharge piping within 12 in. (30.5 cm) of the valve dis- <br /> Before putting the system into service, all components must <br /> • charge port as shown in Figure 4 -29. An inline tee is used <br /> for the installation. The switch is isolated from the chemical be checked for proper operation. During this checkout, <br /> • by a 12 in. to 15 in. (30.5 to 38.1 cm) column of air in the assure that the carbon dioxide pilot cartridge is not installed <br /> form of a vertical pipe nipple. The switch is then mounted at in the control head actuator. Remove the pull pin from the <br /> the top of this nipple. hole in the slide plate. <br /> To check satisfactory operation of the control head, cut the <br /> NOTE terminal link or the "S" hook holding the link. This will relieve <br /> Piping for pressure switch must be included in total all tension on the fusible link line and operate the control <br /> cylinder to T1 piping limitations. The fitting used to • head. The slide plate will move fully to the right. The gas <br /> connect the pressure switch to the distribution piping • valve cable will be released, causing the gas valve to close. <br /> counts as one (1) elbow in that section. Any auxiliary equipment connected to the dry contacts of <br /> • the solenoid monitor and /or the Micro Switch in the control <br /> ► head will operate. <br /> As an alternate, the switch may be connected directly to the <br /> copper tubing of a remotely mounted control head or a PAC If any of these events fail to occur, the problem must be <br /> cylinder. The PS- SPDT -X counts as one cylinder in this sec- investigated and repaired. <br /> tion, and the limitations on copper tubing and /or pipe previ- <br /> ously stated in this manual apply. Repair the terminal link and put the fusible link line back <br /> • into the set position. This is accomplished by using a 1/2 in. <br /> • hex wrench on the fusible link line ratchet wheel. The ratch- <br /> et wheel will be ratcheted in a clockwise direction until the <br /> spring plate makes contact with the top of the control head <br /> box. <br /> Once the fusible link line is set, the control head can be <br /> placed in the set position. To set the control head, the slide <br /> plate is moved from right to left, ensuring the bolt extending <br /> ULEX 3437 CEx732 <br /> March 17, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.