My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10387
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 8:11:53 AM
Creation date
1/31/2011 8:11:47 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10387
Building Department - Name
BOLENDER INVESTMENTS INC
Address
4918 AIRPORT RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 5 — System Maintenance <br /> Page 5 -2 <br /> REV. 2 <br /> 3. Piping and Nozzles. <br /> CAUTION <br /> ► Piping should be blown out with air or dry nitrogen. Nozzle Before screwing the carbon dioxide pilot cartridge <br /> blow off caps should be replaced. into the actuator, ensure that the actuator has an <br /> 0-ring installed. <br /> 4. System Reset. <br /> 8. Inspect the cylinder pressure. Tap the gauge lightly to <br /> All fusible links should be replaced. The fusible link line can ensure the needle is moving freely. If the gauge shows a <br /> now be put into a set position by applying tension to the loss in pressure indicated by the needle being below the <br /> ►fusible link line. This is accomplished by using a 1/2 in. hex green band, the tank should be removed and recharged <br /> • wrench on the fusible link line ratchet wheel. The ratchet per the SYSTEM CYLINDER RECHARGE section of <br /> wheel will be ratcheted in a clockwise direction until the • Chapter V (System Maintenance) in this manual. <br /> spring plate makes contact with the top of the control head <br /> box. The fusible Zink line is now in a set position. <br /> 2. Annual Maintenance. <br /> After setting the fusible link line, the system can be put <br /> back into service by following the SYSTEM CHECKOUT 1. Inspect as per six (6) month maintenance instructions. <br /> AFTER INSTALLATION Section of Chapter IV. 2. Disconnect and remove the discharge piping from the <br /> system. Using air or nitrogen, blow out the discharge <br /> REGULAR SYSTEM MAINTENANCE piping. Replace all nozzle caps. <br /> • 3. Fixed temperature sensing elements of the fusible alloy <br /> 1. Six (6) Month Maintenance. type shall be replaced at least annually or more fre- <br /> quently, if necessary, to assure proper operation of the <br /> 1. Check that the hazard has not changed. system. <br /> • 4. Test thermal detectors and remote pull station per SYS- <br /> 2. Check that all nylon ties are in place and the system TEM CHECKOUT AFTER INSTALLATION section located <br /> has not been tampered with. in Chapter IV System Installation) of this manual. Per <br /> NFPA 72, two (2) or more detectors per circuit should be <br /> 3. Check the entire system for mechanical damage. tested. Note individual detector location and date of test- <br /> ing. Within 5 years, all detectors in system must be tested. <br /> • 4. Check the solenoid monitor. <br /> 5. Replace the carbon dioxide pilot cartridge, recording the <br /> • 5. Disconnect the control head or pneumatic tubing from date of installation on the cartridge with a felt- tipped <br /> each agent cylinder. Remove the carbon dioxide pilot marker. <br /> cartridge and exercise the control head to ensure it is <br /> functioning properly. Make sure the gas shut -off valve CAUTION <br /> and the remote pull station are functioning properly. Before screwing the carbon dioxide pilot cartridge <br /> into the actuator, ensure that the actuator has an <br /> NOTE 0-ring installed. <br /> Before continuing, remove the cover from the control ► <br /> head and insert the pull pin in the hole in the slide 3. Six (6) Year Maintenance. <br /> plate above the latching arm. This will secure the <br /> system, preventing accidental discharge. 1. Inspect as per annual maintenance instructions. <br /> 2. Examine the dry chemical. If there is evidence of cak- <br /> • 6. Inspect fusible link detectors for excessive grease ing, the dry chemical shall be discarded. <br /> buildup. Clean or replace links if necessary. Visually <br /> inspect thermal detectors. 4. Hydrostatic Testing. <br /> NOTE The dry chemical agent cylinder(s) and pneumatic cylin- <br /> der(s) shall be hydrostatically tested at least every twelve <br /> Methods and frequency of inspection, testing and (12) years as per NFPA -17. <br /> maintenance of detectors should be in accordance <br /> with NFPA -72. <br /> NOTE <br /> • Refer to NFPA -17 for additional maintenance require- <br /> • 7. Reinstall the carbon dioxide pilot cartridge and replace ments. <br /> the control head cover and nylon tie. <br /> ULEX 3437 CEx732 <br /> March 17, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.