Laserfiche WebLink
Table of Contents <br /> Page 1 <br /> REV. 3 <br /> TABLE OF CONTENTS <br /> Page Subject Revision Date Page Subject Revision Date <br /> General Information Design (Continued) <br /> 1 -1 General Information 1 9/1/00 3 -3 Piping Limitations — 2 3/17/04 <br /> PCI -15ABC w/1 Nozzle <br /> Components 3 -4 Piping Limitations — 3 9/1/06 <br /> 2 -1 Cylinders & Valve 2 3/17/04 PCI- 25sABC w/2 Nozzles <br /> 2 -2 Nozzles 2 3/17/04 3 -5 Piping Limitations — 3 9/1/06 <br /> Cylinder Bracketing PCI -35ABC w/4 Nozzles <br /> MCH3 Control Head 3 -6 Piping Limitations — 3 9/1/06 <br /> 2 -3 ECH3 Control Head 2 3/17/04 PCI -70ABC w/6 Nozzles <br /> NMCH3 Control Head PCI -70ABC w/8 Nozzles <br /> MB -P2 Mounting Bracket 3 -7 Local Application — Overhead 2 3/17/04 <br /> PDA -D2 Adaptor 3 -8 Piping Limitations — 2 9/1/06 <br /> 2 -4 Pneumatic Actuating Cylinders 2 3/17/04 PCI- 25sABC w/2 Nozzles <br /> PAC -10 3 -9 Piping Limitations — 2 9/1/06 <br /> PAC 200 PCI- 50sABC w/4 Nozzles <br /> 2-5 Detection Equipment 2 3/17/04 3 -10 Protecting Duct and Plenum 2 9/1/06 <br /> on Local Application Systems <br /> FLK-1 Piping Limitations — <br /> FLK 1A PCI -35ABC w/3 Nozzles <br /> FLH-1 3 -11 Detector Placement 3 9/1/06 <br /> 2 -6 Fusible Links 3 9/1/06 <br /> Thermal Detectors Installation <br /> RPS -M Remote Pull Station 4 -1 General 2 3/17/04 <br /> 2 -7 RPS -E2 Electric Pull Station 3 9/1/06 Cylinder Installation <br /> Gas Shut -off Valves Control Head Installation — <br /> Mechanical Single Cylinder <br /> Electrical 4 -2 Multiple Cylinder Installation 3 3/17/04 <br /> 2 -8 Corner Pulleys 2 3/17/04 4 -3 Multiple Cylinder — 2 3/17/04 <br /> SBP -1 PAC -10 or PAC -200 <br /> CBP -1 4 -4 Multiple Cylinders — Two 2 3/17/04 <br /> WBP-1 Control Heads <br /> Tee Pulley 4 -5 Fusible Link Detector Installation 2 3/17/04 <br /> Swing Check Valve Fusible Links Without <br /> 2 -9 Electrical Switches 3 9/1/06 Hangers <br /> Micro 4 -6 Fusible Links With Hangers 2 3/17/04 <br /> Alarm Initiating 4 -7 Thermal Detector Installation 2 3/17/04 <br /> SM- 120/24 Solenoid Monitor Setting The Control Head <br /> 2 -10 Stainless Steel Actuation Hose 2 3/17/04 MCH3 /NMCH3 Control Head <br /> Pipe and Fittings ECH3 Control Head <br /> Pressure Switches 4 -8 Solenoid Monitor Installation 2 3/17/04 <br /> Pressure Bleed Down Adaptor In A Detection Circuit <br /> 2 -11 Component List 2 3/17/04 4 -9 When Used as a Reset 2 3/17/04 <br /> 2 -12 Component List (Continued) 2 3/17/04 Relay <br /> Remote Pull Station Installation <br /> Design RPS -M <br /> 3 -1 General 3 9/1/06 4 -10 RPS -E2 3 9/1/06 <br /> Choosing the Proper Agent Gas Shut -off Valve Installation <br /> Choosing the Proper Type Mechanical <br /> of System 4 -11 Electrical 3 3/17/04 <br /> Total Flooding Tee Pulley Installation <br /> Cylinders Micro Switch Installation <br /> Nozzles 4 -12 Pipe and Nozzle Installation 3 9/1/06 <br /> Temperature Range 4 -13 Tee Positioning 2 3/17/04 <br /> 3 -2 Piping Requirements 3 9/1/06 <br /> Nozzle Placement <br /> Nozzle Coverages <br /> ► Indicates revised information ULEX 3437 CEx732 <br /> • Indicates no change to text — change in page sequence only September 1, 2006 <br />