My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10479
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 9:48:33 AM
Creation date
2/1/2011 9:48:32 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
10-10479
Building Department - Name
HAM,BILLY JOE & PAMELA L
Address
38621 9TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal / Contract <br /> Goodman <br /> _ <br /> & Heating o Air Conditioning g All -TECH AIR, Inc. -- <br /> 38147 16 Ave. �e-6 / 8 kh,4 H/f <br /> Zephyrhills, FL. 33542 <br /> Office 813 - 870 -6934 Fax 813 - 783 -2336 <br /> info@alltechair.com / alltechair.com <br /> State License # CAC1814196 <br /> DATE: 05 /12/10 <br /> PROPOSAL SUBMITTED TO: WORK TO BE PERFORMED AT: <br /> Billy Beckham Same <br /> 38621 9 Ave <br /> Zephyrhills, FI. 33540 813- 799 -1098 <br /> WE HEREBY PROPOSE TO FURNISH THE MATERIALS AND PERFORM THE LABOR NECESSARY FOR: <br /> 8 i,'l / <br /> 1. 1- Goodman(GSX) (13seer) Puron 410A (3 Ton Straight Cool) Split System, 5kw backup heat <br /> Condenser: (GSX130361B) / Air Handlers: (ARUF363616B) (52,775.00) <br /> 2. This also includes all new: 1 - Digital Thermostats, Hurricane Slabs for Condenser, Hang Kit for <br /> Air Handler, Correct size Breakers, Drain, Copper Lines, Line Cover and City of Zephyrhills <br /> Permit. <br /> 3. Increase air flow to master bedroom, check air flow in front room (May hav to remove damper in <br /> duct system) Make sure ducts are clear, sealed and all have good air flow. 5,Q..1 CO P1 I K 50, e 5 <br /> bodr3uZ c rtiC -c- J2XJZ,€pprd.w 441 .5% O <br /> *Good Care Extended Service Plan: 10 Years Compressor, Parts and Labor ($390) * * <br /> *Not including: (Original Electric) <br /> ALL MATERIALS ARE GUARANTEED TO BE AS SPECIFIED, ALL WORK TO BE <br /> COMPLETED IN WORKMANLIKE MANNER FOR THE SUM OF: ($3,165.00) <br /> THREE THOUSAND ONE HUNDRED SIXTY FIVE AND 00 /100 <br /> ANY ALTERATIONS OR DEVIATIONS FROM ABOVE WORK INVOLVING EXTRA COSTS WILL <br /> BE EXECUTED ONLY UPON WRITTEN ORDER AND WILL BECOME AN EXTRA CHARGE <br /> OVER AND ABOVE THE PROPOSAL AMOUNT. ALL AGREEMENTS CONTINGENT UPON <br /> STRIKES, ACCIDENTS, DELAYS BEYOND OUR CONTROL AND ACTS OF GOD. <br /> Respectfully submitted, Patrick Kilgann Expires 30 Days <br /> President All -Tech Air, Inc. <br /> ACCEPTANCE OF PROPOSAL <br /> The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are <br /> authorized to do the work as specified. Payments are as follows: $100 Down and Balance at Start Un <br /> estimated now without chances ($3,065.00) <br /> r <br /> Print / /4 rot, l , y),n Sign ALL' 1 b." / pate S ' /CZ` /D <br /> We appi.eciafe' lathteae/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.