Laserfiche WebLink
; <br /> HANDEX CONSULTING <br /> & REMEDIATION, LLC <br /> May 10, 2010 <br /> City of Zephyrhills <br /> Building Department <br /> 5335 8 Street <br /> Zephyrhills, Florida 33542 <br /> Phone: 813- 780 -0020 <br /> RE: Right -of -Way Use Permit Request <br /> FDEP Facility: Amoco # 171 <br /> Address: 37959 State Road 54, Zephyrhills, Florida <br /> FDEP Facility ID #:51/8519737 <br /> FDEP Work Order #: 2010- 91- W89434 <br /> HCR Project #: 117949.017 <br /> To Whom It May Concern: <br /> The Florida Department of Environmental Protection (FDEP) has approved the <br /> installation, under the supervision of Handex Consulting & Remediation — Southeast <br /> LLC (HCR), of one monitoring well at the above referenced facility. Due to the location <br /> of this proposed monitoring well being in a Right -of -way (ROW) in the easement <br /> between Maine -ly New England Restaurant and 1 St., the installation of this well will <br /> require a City of Zephyrhills ROW Use Permit. This permit application along with the <br /> legal description of the location has been included as Attachment A. <br /> The proposed monitoring well (designated MW -13R) will serve as a replacement well to <br /> existing monitoring well MW -13. The existing well was constructed to a depth of twenty - <br /> nine (29) feet below land surface (ft bls) and serves as a monitoring point for the <br /> collection of groundwater samples for laboratory analysis. The integrity of the well has <br /> degraded since installation of the well in 2001 and is no longer of use. The existing well <br /> MW -13 will be drilled out and the replacement well MW -13R is going to be installed in <br /> the same location. A site plan indicating the well location and the approximate location <br /> of the ROW along 1 St is included in Attachment B. <br /> The well installation will be performed via hollow -stem auger drill rig and MW -13R will <br /> be constructed to a total depth of 35 ft bls with a screened interval of 15 to 35 ft bls. <br /> The well construction details of proposed monitoring well MW -13R have also been <br /> included in Attachment B. The newly installed well will be capped with a locking well <br /> plug, graded to surface level and set beneath a concrete 2 X 2 ft well pad with a steel <br /> manhole complete with a bolt -down cover. <br /> 111 Kelsey Lane, Suite E Tampa, Florida 33619 P: 813 -626 -4646 F: 813 - 626 -1898 www.handex.com <br />