My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10491
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 2:08:59 PM
Creation date
2/1/2011 2:08:50 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
10-10491
Building Department - Name
ZEPHYR COMMONS LLC
Address
7850 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41. The scope includes sizing new wire to be pulled from the existing tenant disconnect to the new tenant <br /> panel via the existing empty conduit. <br /> 42. The scope includes providing a new tenant panel in the location of the existing conduit stub in. The new <br /> panel shall be 200 amp, 120 / 208 volt, 3 phase, and 42 pole. <br /> 43. The scope includes several new power receptacles. These include 1 GFI receptacle in the restroom, 1 <br /> dedicated receptacle for the drinking fountain, 2 ceiling mounted receptacles above the storefront <br /> window, and convenience receptacles along both side walls at 20' -0" on center max. All new receptacles <br /> shall be wired to the new tenant panel. <br /> 44. The scope does not include any changes to the existing sign junction box on the front of the building over <br /> the storefront. The scope does include wiring this junction box to the new tenant panel. <br /> 45. The scope includes wiring the existing RTUs, the new restroom exhaust fan, and all other components of <br /> the HVAC system to the new tenant panel. <br /> 46. The scope does not include any changes to the decorative sconce light fixtures on the front of the <br /> building. These fixtures will remain wired to the house panel. <br /> 47. The scope does not include any changes to the existing wall mounted light fixture on the rear of the <br /> building. The scope does include wiring this Tight fixture to the new tenant panel via a Light switch. <br /> 48. The scope includes providing exit and emergency light fixtures as required by code. These lights shall be <br /> wired to the new tenant panel. <br /> 49. The scope includes providing ceiling mounted 2' x 4' fluorescent tight fixtures at approximately 1 per 100 <br /> sf. These lights shall be wired to the new tenant panel. <br /> 50. The scope does not include any changes to the existing telephone system. The existing conduit stubbed <br /> into the rear of the space shall remain as is. <br /> Fire Alarm <br /> 51. The existing building has a fire alarm system. The landlord's tenant build out contractor will modify the <br /> system as needed to provide a code compliant fire alarm system in space D5 -D6. The landlord's tenant <br /> build out contractor will also modify the rest of the existing fire alarm system as needed to ensure that it <br /> still meets the requirements of the local jurisdiction after the build out for space D5 -D6 is complete. The <br /> design of the alarm system will be handled by the contractor through their shop drawings. The contractor <br /> shall be responsible for determining the exact locations of all fire alarm components and for coordinating <br /> with all other disciplines. The contractor shall be responsible for providing signed and sealed shop <br /> drawings as required for permitting. <br /> 52. - ahaci & Teterson's scope as it relates to the fire alarm system shall be limite�icto schem design and` - <br /> schematic review of the contractor's shop drawings. C &P will provide construction drawings showing <br /> schematic locations of fire alarm equipment. C &P's construction drawings will also include basic <br /> guidelines for design of the system by the contractor. C &P will review the shop drawings as a courtesy <br /> for coordination with other disciplines. C &P's scope will not include review of the shop drawings for <br /> code compliance or constructability. <br />
The URL can be used to link to this page
Your browser does not support the video tag.