My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10507
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 2:29:51 PM
Creation date
2/1/2011 2:29:45 PM
Metadata
Fields
Template:
Building Department
Company Name
AGAPE BAPTIST CHURCH
Building Department - Doc Type
Permit
Permit #
10-10507
Building Department - Name
AGAPE BAPTIST CHURCH
Address
39735 CHANCEY RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zephyrhills Fire Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Marshal Bus (813) 780 -0041 <br /> Kerry Barnett Fax (813) 780 -0044 <br /> E -mail: kbarnett@fire.zephyrhills.fl.us <br /> Plan Review #: 10 -046 <br /> Project: Portables with Walkway <br /> Number of Pages: 9 <br /> May 13, 2010 <br /> I have received and reviewed the plans for the addition of portables and walkway located <br /> at 39735 Chancey Rd and will allow the project to move forward. Please note that this <br /> review does not eliminate any further requirements as the project continues moving <br /> forward. By receiving permit, contractor acknowledges to comply with the items listed <br /> below. Should anyone have any questions, please do not hesitate to contact the Fire <br /> Marshal's office. <br /> 1. Occupant load will be 20 sq ft per person (net). <br /> 2. Install a certified fire extinguisher in each portable. <br /> 3. Install one hardwire smoke detector with battery backup in each portable. <br /> 4. Install an emergency light in restroom of each portable and ensure there is at <br /> least one emergency light in the main space of each portable. <br /> 5. Ensure there is an exit light with battery backup above each exit door of each <br /> portable. <br /> 6. Notify Building and Fire Department for construction of covered roof for <br /> walkway when it is to be completed. Permit may be required by Building <br /> Official. <br /> 7. Building Official is responsible to ensure all electric is code compliant. <br /> Inspections Required: <br /> 1. Final <br /> • i' • • RNETT, FIRE MARSHAL <br /> ** *Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals areas of non - compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.