Laserfiche WebLink
, . „elialtk <br /> EXHIBIT A <br /> RINDIDA <br /> Florida Hospital - Sleep Lab <br /> bid proposal <br /> May 7, 2010 <br /> Print Copies / Reproductions $ 180 <br /> Builders Risk Insurance by owner <br /> Building Permit / Impact Fees / Gov. Fees by owner <br /> Temporary Facilities $ 480 <br /> Supervision $ 7,500 <br /> Clean up / Hauling $ 2,700 <br /> Payroll Overhead $ 6,000 <br /> Final Cleaning $ 900 <br /> Dumpster by owner <br /> Demolition $ 7,000 <br /> Concrete Floor Infill $ 1,850 <br /> Rear HM Door Removal / Infili $ 1,600 <br /> Millwork $ 22,342 <br /> Rough Carpentry $ 1,500 <br /> Rough Materials $ 1,200 <br /> Finish Trim $ 6,200 <br /> Insulation (R -30 @ Deck) $ 2,920 <br /> Glass / Glazing $ 7,880 <br /> Doors / Frames & Hardware * $ 11 ,869 <br /> Door & Hardware Installation $ 1,500 <br /> Metal Studs / Drywall $ 22,578 <br /> Painting $ 7,550 <br /> Acoustical Ceiling $ 3,239 <br /> Floorcovering $ 17,311 <br /> Toilet Accessories $ 1,709 <br /> Fire Extinguishers $ 620 <br /> Plumbing (no new services) # $ 31,506 <br /> HVAC $ 9,880 <br /> Electrical $ 36,517 <br /> Subtotal $ 214,531 <br /> 4% CM Fee $ 8,581 <br /> TOTAL $ 223,112 <br /> * the (3) 4' doors are quoted as flush, 6 panel doors are not available in 4' width <br /> # the water heaters are indicated to be installed above the ceiling - they will not fit <br /> above the ceiling, they will need to be placed in Janitor 126 or an additional closet <br /> blinds are not included <br /> Page 1 of 1 <br />