Laserfiche WebLink
813- 780 -0020 City of Zephyrhills Permit Application Fax- 813 - 780 -0021 <br /> Building Department \4f (o5 1 `� <br /> Date Re r I -- # Phone Contact for Permitting t <br /> Owner's Name abet L 11 1 (--- Owner Phone Number ') 3- 7 7 g - 335 <br /> 3 <br /> Q <br /> Owner's Address C 4 / / /` 1 dcyr- b)CLy Or zephyrhl )1 5 Owner Phone Number <br /> Fee Simple Titleholder Name Owner Phone Number <br /> Fee Simple Titleholder Address r <br /> JOB ADDRESS 6/t// IS r d Gj _ 1A) ,) - Zcph y rlI 1 f-< FL - 33s - 14 a LOT # ? 3 <br /> SUBDIVISION 7.-e‘ wily 1" I C` `7 L PARCEL ID# <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> WORK PROPOSED NEW CONSTR ADD /ALT I SIGN I 1 1 I DEMOLISH <br /> INSTALL REPAIR <br /> PROPOSED USE 1 I SFR I I COMM I I OTHER 1 I <br /> TYPE OF CONSTRUCTION 1 1 BLOCK 1 I FRAME 1 I STEEL 11 I I <br /> DESCRIPTION OF WORK 5r1 C/0 S - L Xi ST)v forC,LN <br /> BUILDING SIZE / a 3'' X ) Li ' SQ FOOTAGE HEIGHT 7 ' <br /> I $ 2 / .--y-, 7 1 VALUATION OF TOTAL CONSTRUCTION <br /> I 'ELECTRICAL $ AMP SERVICE I PROGRESS ENERGY I W.R.E.C. <br /> 1 'PLUMBING $ 060:005.- <br /> I !MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION <br /> I 'GAS I 1 ROOFING n SPECIALTY I I OTHER <br /> FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA 1 IYES NO <br /> BUILDER ( '�` t/ � ��l /� COMPANY //01/1_ C t - fi c v--- SIGNATURE REGISTERED 1 Y/ N 1 FEE CURREN I Y/ N I <br /> Address License # <br /> ELECTRICIAN '-'C OCR a✓ <br /> ' REGISTE Y / N F CURREN SIGNATURE <br /> A ' - f COMPANY )4o ` 1 1 I Y / N 1 <br /> Address License # <br /> PLUMBER COMPANY <br /> SIGNATURE REGISTERED 1 Y / N 1 FEE CURREN I Y / N 1 <br /> Address License # <br /> MECHANICAL c G� COMPANY . <br /> SIGNATURE REGISTERED 1 Y/ N 1 FEE CURREN I Y / N 1 <br /> Address License # <br /> OTHER COMPANY <br /> SIGNATURE REGISTERED L Y/ N 1 FEE CURREN I Y/ N I <br /> Address License # <br /> RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R -O -W Permit for new construction, <br /> Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, <br /> Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions /large projects <br /> COMMERCIAL Attach (3) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R -O -W Permit for new construction. <br /> Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, <br /> Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance <br /> SIGN PERMIT Attach (2) sets of Engineered Plans. <br /> * ** *PROPERTY SURVEY required for all NEW construction. <br /> IIIIII111111I IIII111111111111111 (lillllillllillllllllll Hi11111111 HI1111111 Hillllill H H1111iilllllllllltllllllllllllllllllllllllll (II11111 <br /> Directions: <br /> Fill out application completely. <br /> Owner & Contractor sign back of application, notarized <br /> If over $2500, a Notice of Commencement is requ (A/C upgrades over $7500) <br /> ** Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMITTING (Front of Application Only) <br /> Reroofs if shingles Sewers Service Upgrades A/C Fences (Plot/Survey /Footage) <br /> Driveways -Not over Counter if on public roadways.. needs ROW <br />