Laserfiche WebLink
Jeld — Wen, Inc. (OR) <br /> NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br /> A. DRAWINGS <br /> 1. Manufacturer's die drawings and sections. <br /> 2. Drawing No JW0509 -04, titled "Wood Edge Impact Glazed Steel Door 6' -8" Inswing <br /> Single or Double ", sheets 1 through 6, of 6 prepared by O. M. Engineering Services, <br /> Inc., dated 12/17/04 with revision "C" dated 02/05/08, signed, sealed and dated 06/07/08 <br /> 'by Nimesh Bhaysar, P.E. <br /> B. TESTS <br /> 1. Test reports on: 1) Standard Test Methods for Tension Testing of Metallic Materials, <br /> per ASTM E 8 -01 <br /> Along with marked -up drawings and installation diagram of the tensile properties of a <br /> steel door skin, prepared by Architectural Testing, Inc., Test Report No. ATI 61782.01- <br /> 106-31, dated January 30, 2006, signed and sealed by Joseph A. Reed, P. E. <br /> (Submitted under previous NOA # 05- 1215.04) <br /> 2. Test reports on: 1) Air Infiltration Test, per FBC, TAS 202 -94 <br /> 2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202 -94 <br /> 3) Water Resistant Test, per FBC, TAS 202 -94 <br /> 4) Large Missile Impact Test per FBC, TAS 201 -94 <br /> 5) Cyclic Wind Pressure Loading per FBC, TAS 203 -94 <br /> 6) Forced Entry Test, per FBC 2411 3.2.1, TAS 202 -94 <br /> Along with marked -up drawings and installation diagram of outswing steel door, <br /> prepared by National Certified Testing Laboratories, Test Report No. NCTL 210- 3195- <br /> 1 dated 09/28/05, signed and sealed by Gerard John Ferrara, P.E. <br /> (Submitted under previous NOA # 05- 1215.04) <br /> C. CALCULATIONS <br /> 1. Anchor verification calculations and structural analysis, complying with FBC -2004, <br /> prepared by O. M. Engineering Services, Inc., dated 03/07/08, signed and sealed by <br /> Nimesh Bhaysar, P.E. <br /> Complies with ASTM E1300 -02 <br /> D. QUALITY ASSURANCE <br /> 1. Miami Dade Building Code Compliance Office (BCCO). <br /> E. MATERIAL CERTIFICATIONS <br /> 1. Notice of Acceptance No. 03- 0827.08 issued to Solutia Inc. for "Clear or Colored <br /> Interlayer" dated 03/04/04, and expiring dated 03/04/09. <br /> 2. Notice of Acceptance No. 07- 0214.07, issued to ODL Inc. for "ODL/Westem Reflection <br /> Series Aluminum Glazed Lite Kit Assembly- Impact" approved dated 03/22/07, expiring <br /> dated 07/28/10. <br /> Jaime D. anon, P.E. <br /> Chief, Product Control Division <br /> NOA No. 08- 0312.12 <br /> Expiration Date: May 25, 2011 <br /> Approval Date: July 24, 2008 <br /> E -1 <br /> 11 <br />