Laserfiche WebLink
Jun. 2 1 . 2010 5 : 0 8 P M e. Work around the foundation until vie enure pool No. 0 6 3 9inc P. 5a into me <br /> I - bottom rails and the top edge is covered with slotted tubes and connec- <br /> tors (and beaded liner retainers if you have a beaded pool liner). <br /> 2. Join the Ends of the Pool Wall <br /> O a Lineup the holes in the two [Outside 1 <br /> ends of the pool wall. / <br /> HMI: <br /> Stick a screwdriver �Inswe A through two of the - <br /> holes to help line up <br /> the ends of the wall. , A <br /> • 5 <br /> b. To line up the holes, make the circle bigger or <br /> smaller by nudging the base plates in or out with <br /> your foot. _ <br /> 6 <br /> c. Join the ends of the poolwall <br /> 0 with Q a bolt and nut through <br /> Remember. v <br /> each hole Place each bolt head Lida C`\� <br /> The bolt heads must towards the inside of the <br /> be toward the inside pool and each nut towards N of the pool. Cover '\∎ �, � <br /> the bolt headswlth the outside. ■\ ' . <br /> duct tape. d. Tighten each bolt and nut ,�� <br /> securely. +\ , <br /> 7 _ I. <br /> -.141 <br /> • e. Cover the seam and bolt heads Outside on the inside of the pool wall - e • <br /> completelywlth 2" (50 mm) duct ' —J <br /> tape. ! <br /> 1 <br /> 8 <br /> 3 No DivingorJumpfng. Observe a1lScrlelyRules <br />